NRP620-9 OMEPAPV20161017 (ENGLISH) REV 1
Page 11 of 42
Required Tools
Flat-bit screwdriver
Phillips screwdriver
5/16” nut driver
3/8” nut driver
7/16” wrench
7/16” socket
Drill motor and ¼” drill bit
Furnace Clearances and Accessibility
The A-Maize-Ing Heat® furnace can be installed on a combustible floor if a non-combustible material is
placed directly under the ash removal door and chimney connector. The mat is to extend at least 16”
in front of and 8” to each side of the ash removal drawer and 2” either side of the chimney connector.
Recommended distances for ease of use and serviceability:
Top 32”
Opposite side from bin 24”
Front 36”
Rear-most surface 18”
18 "**
24 "*
36 "*
12 "
Recommended Clearances
Содержание NRP620-10
Страница 2: ...DATE OF MFG SERIAL MODEL ...
Страница 3: ...CONFORMS TO UL STD 391 CERTIFIED TO CSA STD B366 1 CAN CSA B415 1 10 ASTM E2515 2011 ...
Страница 26: ...NRP620 10 OMEPAPV20161017 ENGLISH REV 1 Page 23 of 42 1 7 8 1 3 5 5 3 4 HOPPER SPOUT Illustration 5 ...
Страница 44: ...NRP620 10 OMEPAPV20161017 ENGLISH REV 1 Page 41 of 42 This page intentionally left blank for your notes ...
Страница 47: ...NRP620 9 OMEPAPV20161017 ENGLISH REV 1 Page 2 of 42 This page intentionally left blank for your notes ...
Страница 68: ...NRP620 9 OMEPAPV20161017 ENGLISH REV 1 Page 23 of 42 1 7 8 1 3 5 5 3 4 HOPPER SPOUT Illustration 5 ...
Страница 86: ...NRP620 9 OMEPAPV20161017 ENGLISH REV 1 Page 41 of 42 This page intentionally left blank for your notes ...