Boiler Installation and Owners Manual
8
LDJ991_E01_R03_2006.03
Models LDJ991 and LDJ991-10
Unpacking and Setup - Storage Bin
Step 1: Remove base parts and storage bin
from shipping container.
Step 2: Assemble base rails (1) and legs (2)
together with sixteen 1/4"-20 x 1/2" bolts (3)
and nuts.
Step 3: Position storage bin (4) on top of base (5).
Make sure it is level and fitted against base at all
corners.
Step 4: Slide auger boot (6) with clamp (7) over
bin outlet. Tighten clamp securely.
Step 5: Install two sheet metals screws through
clamp, auger boot, and into the bin outlet for a
permanent connection.
Step 6: Install coupler (8) between bin auger
tube and boiler fuel inlet. Secure with two hose
clamps (9).
Step 7: Attach flexible conduit (10) from bin
auger to boiler auger motor housing (11) with a
conduit locknut.
Step 8: Connect one black bin auger motor wire
to the two orange wires in the auger motor
housing with a wire nut connector.
Step 9: Connect the other black bin auger motor
wire to the two white wires in the auger motor
housing with a wire nut connector.
Step 10: Install cover on auger motor housing.
1
2
3
4
5
6
7
8
9
9
10
11