Chapter 3. Installing the Battery Backup Unit
32
3ware 9650SE Serial ATA RAID Controller Installation Guide
b
Press down gently on the top of the battery unit so that the
battery holder flexes slightly and the clip on the bottom
slips over the slot on the bottom edge of the controller.
Figure 27. Pressing down gently so that the bottom clip can
be inserted
If you have a 12-port or 16-port 9650SE:
a
Insert the clips on the top of the battery module into the
holes on the controller.
Figure 28. Attaching the battery module to the full-height
controller
b
Press down gently on the battery module until the bottom
clip snaps into place in the lower hole.
Bottom clip
Содержание 3WARE 9650SE
Страница 1: ...3ware 9650SE Serial ATA RAID Controller PN 720 0147 00 October 2006 Installation Guide...
Страница 42: ......