Step 2: Mount the SGLP-RO System
7.000
.450
.750
1) Select the location to mount the SGLP-RO unit. (SGLP-RO overall dimensions: 12-1/4” W
x 17-3/4” H x 9-5/16” D).
2) Allow clearance on each side of the system for inlet and outlet tubing connections.
3) Allow 3” clearance below the system for cartridge replacement.
4) If desired, a mounting bracket template is included in the installation manual.
NOTE: Mounting hardware (installer supplied) must be capable of supporting a minimum
of 50 lbs. (22.7 kg).
NOTE: Make sure that the bracket is securely mounted to a wall stud or other appropriate
wall structure.
4