Step 5: Complete plumbing connections on SGLP-RO System
NOTE: Refer to installation diagram above.
1) Install installation parts onto the SGLP-RO unit and close the inlet and sample water
valves.
2) Connect inlet water supply to the SGLP-RO system inlet using either the quick connect
fitting or the supplied hose barb (if using hose).
3) Install drain line from permeate pump brine out port to a drain.
4) Run tubing from the SGLP-RO outlet to the Duke oven.
NOTE: The SGLP-RO comes with two outlet fittings to accommodate different types
of tubing. One fitting is a ¼” barb as shown in the diagram above. This fitting should be
used with flexible tubing. A 3/8” stem x ¼” quick connect fitting is also included for rigid
poly tubing.
“Brine Out”
Port
RO Outlet to Duke Oven
3/8”
Blue Tubing
Outlet Tee
Water Sample
Valve Assembly
Feedwater from the
Beverage Outlet on the
Subway® Filter System
RO Membrane Plug
“Brine In”
Port
1/4” Red Tubing
(To Drain)
Red
Tubing
(To Bottom
of RO
Membrane
Cartridge)
Using Push-In Fittings
(1) Pre-filter Sediment & Carbon
(2) RO Membrane
To Attach Tubing
Push tubing in as far as it will go. Tubing must be inserted past
o-ring and hit backstop. Pull tube to ensure it is secured.
To Release Tubing
Push in grey collet to release tubing. With collet held,
pull tubing straight out.
1
1
2
2
Remove the red tubing from the fitting before
completely removing the RO Membrane
6