Page 3
thinner borders indicate stored results. When more than
one result is shown on the screen,
cycles between them.
The index at the end of this manual is a good way to
quickly find the meaning of any icon. Also, on the inside
pouch of the carrying case there is a card which provides an
easy reference to the most common of the graphical icons.
Test Leads
The Test Lead icons are shown on each of the measurement
screens. Each lead points to a colored dot on the front label
that corresponds to the actual test lead. The labels
,
and
correspond to Ring, Ground and Tip for North
America and to B, Earth and A for other countries. All the
tests on the 945DSP use these same connections so there is
no need to rearrange leads between tests:
Red Lead
to
Ring
or
B
Green Lead to
Ground
or
Earth
Black Lead
to
Tip
or
A
Also, rearranging the leads or moving the leads to a new
pair while a test is in progress may cause inaccurate results.
You may need to return to the Power On Screen and restart
the test.
Keep the test leads clean and dry at all times to insure best
accuracy of the measurements. Use soap and water to clean
them if necessary.
Содержание Dynatel 945DSP
Страница 2: ...Dynatel 945DSP Subscriber Loop Tester Instruction Manual March 8 2004 78 8130 3440 8 Rev B ...
Страница 11: ...Page 7 Then press the desired test or control key ...
Страница 36: ...Telecom Systems Division 6801 River Place Blvd Austin Texas 78726 9000 USA http www mmm com telecom 3M 2000 ...