3M DBI-SALA Nano-Lok Скачать руководство пользователя страница 16

16

2.0 USE

2.1 

RESCUE PLAN:

 When using this equipment, the employer must have a rescue plan and the means at hand to implement it and 

communicate that plan to users, authorized persons, and rescuers.

2.2 

INSPECTION FREQUENCY:

 Per the 

Inspection Schedule (Table 2)

, SRDs must be inspected by a worker

1

 before each use. SRDs must be 

inspected by a Competent Person

2

 at intervals determined from the Inspection Schedule. See the 

Inspection and Maintenance Log (Table 3) 

for inspections procedures.

Repairable SRDs must be submitted to a 3M Authorized Service Agent for Revalidation Inspection at intervals determined from the 

Inspection Schedule (Table 2)

. The Authorized Service Agent will record their findings and label the product with the next annual service date. 

Results of the Authorized Service Agent or Competent Person inspection should be recorded in the 

“Inspection and Maintenance Log” 

at the 

back of these instructions or recorded with the Radio Frequency Identification (RFID) system (see 

Section 5

).

2.3 

NORMAL OPERATIONS:

 Normal operation will allow the lifeline to extend and retract with no hesitation or slack as the worker moves at 

normal speeds. If a fall occurs, a speed sensing brake system will activate, stopping the fall and absorbing much of the energy created. 

Sudden or quick movements should be avoided during normal work operation, as this may cause the SRD to lock up. For falls which occur 

near the end of the lifeline travel, a reserve lifeline system or Energy Absorber has been incorporated to reduce the fall arrest forces.

2.4 

BODY SUPPORT:

 A Full Body Harness must be used with the Self-Retracting Device. The harness connection point must be above the user’s 

center of gravity. A body belt is not authorized for use with the Self-Retracting Device. If a fall occurs when using a body belt it may cause 

unintentional release or physical trauma from improper body support.

2.5 

COMPATIBILITY OF COMPONENTS:

 Unless otherwise noted, 3M equipment is designed for use with 3M approved components and subsystems 

only. Substitutions or replacements made with non approved components or subsystems may jeopardize compatibility of equipment and may 

affect safety and reliability of the complete system.

2.6 

COMPATIBILITY OF CONNECTORS:

 Connectors are considered to be compatible with connecting elements when they have been 

designed to work together in such a way that their sizes and shapes do not cause their gate mechanisms to inadvertently open regardless 

of how they become oriented. Contact 3M if you have any questions about compatibility. Connectors (hooks, carabiners, and D-rings) must 

be capable of supporting at least 5,000 lbs. (22.2 kN). Connectors must be compatible with the anchorage or other system components. 

Do not use equipment that is not compatible. Non-compatible connectors may unintentionally disengage (see Figure 5). Connectors must 

be compatible in size, shape, and strength. Self-locking snap hooks and carabiners are required. If the connecting element to which a snap 

hook or carabiner attaches is undersized or irregular in shape, a situation could occur where the connecting element applies a force to the 

gate of the snap hook or carabiner (A). This force may cause the gate to open (B), allowing the snap hook or carabiner to disengage from 

the connecting point (C). 

2.7 

MAKING CONNECTIONS:

 Snap hooks and carabiners used with this equipment must be self-locking. Ensure all connections are 

compatible in size, shape and strength. Do not use equipment that is not compatible. Ensure all connectors are fully closed and locked. 3M 

connectors (snap hooks and carabiners) are designed to be used only as specified in each product’s user’s instructions. See Figure 6 for 

examples of inappropriate connections. Do not connect snap hooks and carabiners:

A.  To a D-ring to which another connector is attached.
B.  In a manner that would result in a load on the gate. 

Large throat snap hooks should not be connected to standard size D-rings or similar 

objects which will result in a load on the gate if the hook or D-ring twists or rotates, unless the snap hook is equipped with a 3,600 lb (16 kN) gate.

C.  In a false engagement, where features that protrude from the snap hook or carabiner catch on the anchor, and without visual 

confirmation seems to be fully engaged to the anchor point.

D.  To each other.
E. 

Directly to webbing or rope lanyard or tie-back (unless the manufacturer’s instructions for both the lanyard and connector specifically 

allows such a connection).

F. 

To any object which is shaped or dimensioned such that the snap hook or carabiner will not close and lock, or that roll-out could occur.

G.  In a manner that does not allow the connector to align properly while under load.

Table 2  –  Inspection Schedule

Frequency of 

Use

1

Application

Conditions

Worker 

Inspection 

Frequency

2

Competent 

Person Inspection 

Frequency

3

Duration Between 

Product Revalidation 

Inspections

4

Infrequent to Light

Rescue, Confined 

Space, Factory 

Maintenance

Good Storage 

Conditions, Indoor or 

Infrequent Outdoor Use, 

Room Temperature, 

Clean Environments

Before Each Use

Annually

Not Longer than Every 5 

Years

Moderate to Heavy

Transportation, 

Residential 

Construction, Utilities, 

Warehouse

Fair Storage Conditions, 

Indoor and Extended 

Outdoor Use, All 

Temperatures, Clean or 

Dusty Environments

Before Each Use

Semi-Annually to 

Annually

Not Longer than Every 2 

Years

Severe to 

Continuous

Commercial 

Construction, Oil and 

Gas, Mining, Foundry

Harsh Storage 

Conditions, Prolonged 

or Continuous Outdoor 

Use, All Temperatures, 

Dirty Environment

Before Each Use

Quarterly to Semi-

Annually

Not Longer than Every 

Year

1. 

Frequency of Use must be determined by a Competent Person

2. 

Failure of a Worker to inspect “Before Each Use”, or failures identified during the Worker Inspection will require a Competent Person Inspection.

3. 

Failure of a Competent Person to inspect per the frequencies in this Inspection Schedule, or failure identified during the Competent Person Inspection will require a 

Product Revalidation Inspection or removal from service and disposal of the product.

4. 

SRDs considered non-repairable, or not designed for disassembly and internal inspection do not qualify for Revalidation Inspection. These SRDs have other service 

life and inspection requirements as provided in the manufacturer’s instructions.

1 Worker:

 Any person who is protected from falling by an active and/or passive fall-protection system, or in the case of a fall-arrest system, any person who might fall 

while attached to the system.

2  Competent Person:

 An individual designated by the employer to be responsible for the immediate supervision, implementation, and monitoring of the employer’s 

managed fall protection program who, through training and knowledge, is capable of identifying, evaluating, and addressing existing and potential fall hazards, and 

who has the employer’s authority to take prompt corrective action with regard to such hazards

Содержание DBI-SALA Nano-Lok

Страница 1: ...420 lb 190 kg 3101222 1 1 1 6 ft 1 8 m 310 lb 140 kg 420 lb 190 kg 3101230 1 1 1 6 ft 1 8 m 310 lb 140 kg 420 lb 190 kg 3101231 1 1 1 6 ft 1 8 m 310 lb 140 kg 420 lb 190 kg 3101232 1 1 1 6 ft 1 8 m 3...

Страница 2: ...10 lb 140 kg 420 lb 190 kg 3101259 1 1 1 6 ft 1 8 m 310 lb 140 kg 420 lb 190 kg 3101282 2 1 2 6 ft 1 8 m 310 lb 140 kg 420 lb 190 kg 3101283 2 1 2 6 ft 1 8 m 310 lb 140 kg 420 lb 190 kg 3101284 2 1 2...

Страница 3: ...10 11 12 13 14 15 CSA OSHA 3101668 2 1 2 6 ft 1 8 m 310 lb 140 kg 420 lb 190 kg 3101671 1 1 1 6 ft 1 8 m 310 lb 140 kg 420 lb 190 kg 3101676 1 1 1 6 ft 1 8 m 310 lb 140 kg 420 lb 190 kg 3101223 2 1 1...

Страница 4: ...4...

Страница 5: ...5 2 E D C A B G F C A B D H C A B B A C D h 3 A B FC FF DD SF FC FF DD SF C FC H...

Страница 6: ...1 5 6 5 ft 2 0 m 5 1 ft 1 6 m 7 1 ft 2 2 m 4 0 ft 1 2 m FC 2 0 6 3 0 9 4 1 2 5 1 5 V H FC x 1 141 191 kg R TM ft m 1 0 3 1 0 3 2 0 6 3 0 9 4 1 2 5 1 5 ft m 1 0 3 2 0 6 3 0 9 4 1 2 5 1 5 7 2 ft 2 2 m 5...

Страница 7: ...7 7 B D C A 8...

Страница 8: ...8 9 1 A B B A Delta III ExoFit NEX 2 C C D 3 4 5 A D A...

Страница 9: ...9 10 1 A B 2 C D D 3 F G E 4 A E 5 F E 6 A D C...

Страница 10: ...10 11 1 2 3 4 5 6 7...

Страница 11: ...11 12 E D A G D B F C F 13 14 A B C 15...

Страница 12: ...ir l etiquette RFID pour le numero de serie Patent Pending 9514365 Rev A Model No N De Modele Mfrd Yr Mo Fabr An Mo Lot Length Longueur ft m 3M com FallProtection Red Wing MN 55066 USA See RFID tag fo...

Страница 13: ...the SRD Avoid sudden or quick movements during normal work operation This may cause the device to lock up Ensure that fall protection systems subsystems assembled from components made by different man...

Страница 14: ...lb 3 Fixed D Ring SRD Harness Interface Steel 19 mm 3 4 in 16 kN 3600 lb 22 2 kN 5000 lb 4 Cab Mount Stainless Steel 41 mm 1 5 8 in 5 SRD Harness Interface Steel 51 mm 2 in 16 kN 3600 lb 22 2 kN 5000...

Страница 15: ...occur when the anchorage point is not directly above the point where a fall occurs The force of striking an object in a swing fall may cause serious injury see Figure 3A Minimize swing falls by worki...

Страница 16: ...this equipment must be self locking Ensure all connections are compatible in size shape and strength Do not use equipment that is not compatible Ensure all connectors are fully closed and locked 3M co...

Страница 17: ...vel Eye on the SRD E Thread the Interface through the Swivel Eyes so the SRD hangs from the backbone of the Harness Interface F 4 Position the Harness Interface around the Web Straps Position the open...

Страница 18: ...oth layers of harness webbing until you hear a click The pin should be firmly locked in place 4 0 OPERATION First time or infrequent users of Self Retracting Devices SRDs should review the Safety Info...

Страница 19: ...ng a fall must be eliminated 4 8 HORIZONTAL SYSTEMS In applications where the SRD is used in conjunction with a horizontal system i e Horizontal Lifeline Horizontal I Beams Trolley the SRD and horizon...

Страница 20: ...If the SRD has been subjected to fall force or inspection reveals an unsafe or defective condition remove the SRD from service and discard see Disposal 6 3 STORAGE TRANSPORT Store and transport the S...

Страница 21: ...ould open close lock and unlock properly Locking Buttons B and Locking Pins C should function correctly Web Lifeline Figure 18 Inspect webbing material must be free of cuts A frays B or broken fibers...

Страница 22: ...22...

Страница 23: ...te non obstru e est n cessaire pour que le dispositif auto r tractable se bloque normalement vitez les mouvements brusques ou rapides durant le travail normal Ce type de mouvements pourrait provoquer...

Страница 24: ...po 16 kN 3 600 lb 22 2 kN 5 000 lb 3 Interface de harnais pour dispositif autor tractable anneau en D fixe Acier 19 mm 3 4 po 16 kN 3 600 lb 22 2 kN 5 000 lb 4 Montage sur cabine Acier inoxydable 41...

Страница 25: ...n de la ligne Chutes avec mouvement de balancier Les chutes avec mouvement de balancier surviennent lorsque le point d ancrage n est pas directement au dessus du point o la chute s est produite Si un...

Страница 26: ...ager du point d attache C 2 7 CONNEXIONS Les crochets ressort et les mousquetons utilis s avec cet quipement doivent tre autoverrouillables S assurer que toutes les connexions sont compatibles en ce q...

Страница 27: ...ser l interface de harnais pour dispositif autor tractable entre les sangles en toile et le rembourrage de protection de l anneau en D 2 Ouvrir l interface du harnais Pousser simultan ment les boutons...

Страница 28: ...tion verrouill e Une fois que l interface du harnais est ferm e tirer les sangles en toile A travers l anneau en D dorsal pour liminer le mou au niveau des sangles et fixer fermement l interface du ha...

Страница 29: ...romettre la compatibilit du raccordement en raison de l interaction entre les connecteurs Cela est donc d conseill Le raccordement de chaque longe du dispositif autor tractable des points d ancrage di...

Страница 30: ...me satisfait aux crit res d inspection il peut tre utilis 6 0 ENTRETIEN et ENTREPOSAGE 6 1 NETTOYAGE Les proc dures de nettoyage du dispositif autor tractable sont les suivantes Nettoyer r guli remen...

Страница 31: ...bon tat de fonctionnement Lorsque pr sents Les clavettes A devraient s ouvrir se fermer se verrouiller et se d verrouiller correctement et les boutons d arr t B et les goupilles d arr t C devraient fo...

Страница 32: ...reserves the right to require product be returned to its facility for evaluation of warranty claims This warranty does not cover product damage due to wear abuse misuse damage in transit failure to m...

Отзывы: