ProJet
®
x60
Pro
Series User Guide
Setup And Print The Build
3dscentral.3dsystems.com
24
All Rights Reserved
5/12/13
2.
Open the printer top cover. From the main menu on the LCD select
ACCESS BUILD PLATE
.
3.
Raise the cart using the foot-operated jack so that the cart is level with the bottom of the build plate. Be
careful the cart is not too low - it can damage the service station or the front of the printer.
4.
Maneuver the part cart so that the front of the cart is adjacent to the build plate.
5.
Using the handle, pull the build plate up and towards the cart until it slides onto the cart.
6.
Move the cart to the Core Recycling Station. Adjust the height of the cart so it is level with the opening
of the Station.
7.
Slide the build plate carefully into the Core Recycling Station. Alternatively, for small parts, one can
also carefully move the parts from the part cart into the Station by hand.
8.
Close the Core Recycling Station glass cover.
9.
Close the printer top cover.
2.10.5 Fine Cleaning in the CRS
The freshly-printed part will still have Core clinging to it, which must be removed before proceeding with
the post-processing steps.
1.
With your part in the Core Recycling Station and the top cover closed, turn the compressor and suction
system on by turning the user switch to ON. It will take approximately 15 seconds for the suction sys-
tem to fully turn on.
2.
Choose either the Air Gun or the Air Wand to remove loose Core material. The Air Gun is ideal for pre-
moving large amounts of Core. The Air Wand is ideal for clearing out tight spaces and bringing out
details in a part.
3.
Test the air flow against your hand and adjust as needed. Adjust the air pressure on the Air Gun with
the trigger. Adjust the pressure on the Air Wand by turning the control nut located at the connection
between the Air Wand and its air hose.