05.0 Facility Guidelines

This section provides detail relating to site selection, site preparation and readiness of the facility to accept and install the ProJet™ Production
Printing System.
Discuss the appropriate equipment locations with a 3D Systems' representative, so that the equipment is located in a convenient, appropriate
location based on your organization's needs. When planning an installation, consider:

05.1 Space Planning

05.2 Access Area Surrounding Printers

05.3 Unit Portability

05.4 Electrical

05.5 Client Workstation Requirements

05.6 Network Interface

05.7 Material Storage

05.8 Material Bottle Disposal

05.9 Weights and Measures

05.1 Space Planning

Below is a suggested floor plan for a ProJet™ Production Printing System installation. Each printer requires use of a dedicated circuit. Multiple
printers CAN NOT be located on a single circuit. An additional 110 or 220 VAC outlet is recommended for service needs. A phone near the printer
is recommended to facilitate machine support. Each location of the machine requires a standard wall power outlet or power drop to power printer. 
The outlet location must be near the printer and remain accessible to the end user at all times.

*NOTE: The ProJet Finisher XL has to be hard-wired in the facility. Ensure a certified electrician is required for installation.

A freezer is required for cooling parts after builds. The size of the freezer must be able to accommodate the build platform's size of 22 (L) x
16.25(W).

Dimensions

(WxDxH)

Crated:

1828 x 1155 x 1981mm (72 x 45.5 x 78 inches)

Uncrated:

1531 x 908 x 1450mm (60.3 x 35.7 x 57.1 inches)

NOTE: The printer MUST be placed on a vibration free concrete floor. Do not install on any other floor covering such as
vinyl, tile, carpeting, etc.. Doing so WILL affect machine performance.

NOTE: The ProJet™ Production Printing System is not designed to connect to an IT system.

Содержание ProJet 5000

Страница 1: ... 5 3 05 3 Unit Portability 6 1 5 4 05 4 Electrical 7 1 5 5 05 5 Client Workstation Requirements 7 1 5 6 05 6 Network Interface 8 1 5 7 05 7 Material Storage 8 1 5 8 05 8 Material Bottle Disposal 9 1 5 9 05 9 Weights and Measures 9 1 6 06 0 Operating Enviroment 9 1 6 1 06 1 Air Conditioning 9 1 6 2 06 2 Humidity 10 1 6 3 06 3 Lighting 10 1 6 4 06 4 Vibration and Shock 10 1 7 07 0 Preparation for Sh...

Страница 2: ...ng 06 4 Vibration and Shock 07 0 Preparation for Shipment Arrival 08 0 MDM Bottle Build Platform Installations 09 0 Limitation of Liability 10 0 Thank You 11 0 Contacting 3D Systems 12 0 Printer Advance Preparation Checklist 01 0 About this Manual This document includes all of the overall facility requirements that will be needed to have a successful installation when our 3D Systems Customer Suppo...

Страница 3: ...th bypass engaged is accessible in the vicinity of this sign or behind the access panel Avoid contact Hot surfaces can cause severe A hot surface burns Access panels are for service only and should be opened only by certified service personnel or trained maintenance personnel Indicates that skin or eye irritation could result while exposed to a chemical composition Harmful Irritant Warning When ac...

Страница 4: ...ow is a suggested floor plan for a ProJet Production Printing System installation Each printer requires use of a dedicated circuit Multiple printers CAN NOT be located on a single circuit An additional 110 or 220 VAC outlet is recommended for service needs A phone near the printer is recommended to facilitate machine support Each location of the machine requires a standard wall power outlet or pow...

Страница 5: ......

Страница 6: ... for use on rough or uneven surfaces including deep carpet To avoid the risk of tipping the printer when moving between locations only push from the side of the printer The printer is intended to be lifted from its crate base using a fork lift device and place on casters to roll to its final destination Leveled fork lift pads have been placed beneath the machine to accommodate this need The front ...

Страница 7: ...specially in areas where circuits may be affected by an outside source i e lightning required strikes power interruption etc They should have a Some examples of suppliers are Toshiba or APC Power loss during a build will fail the build and minimum rating of 3KVA can cause damage to your printer Uninterruptible power is critical to the successful operation of the machinery 05 5 Client Workstation R...

Страница 8: ...k Not all networks have the TCP IP installed Make sure to have a network administrator check that TCP IP are both installed and are running as required PRIOR TO THE ARRIVAL of the printer 05 7 Material Storage VisiJet part and support materials should uie stored in a conveniently located storage cabinet in proximity to the printer itself A cabinet is recommended to protect against long term exposu...

Страница 9: ...acing the printer in any environment with airborne contaminant including cigarette smoke fumes and mechanical particulates that can adversely affect the long term functioning of this equipment Each ProJet Production Printing System undergoes an operational test at the factory and is shipped with a limited residual amount of build and support material already in its internal reservoir When ordering...

Страница 10: ... qualified 3D Systems Field Service Engineer or an authorized reseller The following topics should be arranged PRIOR TO THE ARRIVAL OF THE SYSTEM to simplify installation of the ProJet Production Printing System Refer to later sections of this guide for details of this procedure Make sure the following resources are available ____ A forklift or similar heavy duty equipment required for unloading t...

Страница 11: ...t Before removing bottle from the MDM re tighten bottle cap to prevent spillage To remove bottle open material delivery module and press release latch down and lift bottle out of module Build Platform Ensure that the corner guides on the backside of platform are clean and free of debris If debris exists when installing the platform guides will not lock into the platform elevator NOTE Clean platfor...

Страница 12: ...ing System or other products or services 3D Systems strives for higher quality better products and comprehensive services to benefit our customers 11 0 Contacting 3D Systems For information or assistance contact 3D Systems corporate headquarters at 3D Systems Corporation 333 Three D Systems Circle Rock Hill SC 29730 Toll Free Number 800 889 2964 Phone Number 803 326 4080 Web www 3dsystems com Emai...

Страница 13: ...________________ Email _____________________________________________________________________ Please place a check in each box once that item is complete Check Box Final installation site selected The intended physical location for each ProJet Production Printing System s should be selected in advance and checked for adherence to the guidelines set out in this guide If required by the shipper a met...

Страница 14: ...nter is installed we agree not to alter any requirements without consulting with 3D Systems Customer Service Representative If alteration are made without consulting 3D Systems it may void the system s warranty ___________________________________ _______________ Customer Signature Date Please return a copy of the check list by FAXING it to the appropriate fax number provided in Contacts ...

Отзывы: