ProJet™ 5000 Printer Facility Requirements Guide
Table of Contents
01.0 About this Manual
02.0 What is a Facility Requirements Guide
03.0 Symbols Used in this Guide
04.0 The ProJet™ Production Printing System
04.1 What is Included with a ProJet™ Production Printing System
05.0 Facility Guidelines
05.1 Space Planning
05.2 Access Area Surrounding Printers
05.3 Unit Portability
05.4 Electrical
05.5 Client Workstation Requirements
05.6 Network Interface
05.7 Material Storage
05.8 Material Bottle Disposal
05.9 Weights and Measures
06.0 Operating Enviroment
06.1 Air Conditioning
06.2 Humidity
06.3 Lighting
06.4 Vibration and Shock
07.0 Preparation for Shipment Arrival
08.0 MDM Bottle & Build Platform Installations
09.0 Limitation of Liability
10.0 Thank You
11.0 Contacting 3D Systems
12.0 Printer Advance Preparation Checklist
01.0 About this Manual
This document includes all of the overall facility requirements that will be needed to have a successful installation when our 3D Systems
Customer Support Engineers (CSEs) or authorized 3D Systeods representatives arrive to install your 3-D printer.
02.0 What is a Facility Requirements Guide
This guide provides important information on selecting a facility location and planning for the installation of 3D Systems' ProJet™ Production
Printing System. It also presents planning guidelines to facilitate fast, convenient installation and operation of your printer.
Содержание ProJet 5000
Страница 5: ......