Switch Module
39
ELAN names you have selected. You will need them for setting up the
other switch module.
13
When finished, close the Backbone and Services window.
14
Wait one minute to allow the LECS order database to transfer to the
other switch module.
The LECS ELAN database does not transfer automatically.
15
Reboot the switch using the LMA menu sequence:
(1) SYS / (7) RBO
.
The purpose of this step is to make the first switch module active in order
to set up the LANE services there.
16
After the first switch boots, check its connectivity with the NMS station as
in step 8).
17
Perform steps 10) and 12) using the same list of ELANs.
18
Wait one minute.
Verifying LANE Redundancy Setup
19
Use the MIB browser under the Transcend tools menu and browse
through the MIB to verify that all the information regarding the LECS
order list has been transferred correctly.
Look in the following MIB location:
■
private
■
enterprises
■
atmForum
■
atmForumNetworkManagement
■
atmLanEmulation
■
elanMIB
■
elanLecsGroup
■
elanLecsConfGrou.
■
lecsConfTablelecsConfEntry
■
lecsAtmAddrSpec
Press start query. The LECS order list is displayed on the bottom window.
20
Close the Backbone and Services Select window.
21
Open the Backbone and Services Select window again and use it to check
that the LECS database is correct.
Содержание CoreBuilder 7000
Страница 8: ......
Страница 20: ...20 CHAPTER 1 OVERVIEW...
Страница 54: ...54 CHAPTER 5 POWER ON...
Страница 96: ...96 CHAPTER 8 TROUBLESHOOTING...
Страница 100: ...100 APPENDIX A ATM SWITCH FA 24 CELL SWITCHING MODULE SPECIFICATIONS...
Страница 104: ...104 APPENDIX B SAFETY INFORMATION...
Страница 122: ...122 APPENDIX D CABLING REQUIREMENTS...
Страница 128: ...128 APPENDIX E TECHNICAL SUPPORT...
Страница 148: ...148 INDEX...