1.
Please connect the load on the DC/AC output terminal on the solar charge controller.
2.
Connect the solar panels with MC4 connectors on the trailer enclosure and turn all the breakers on the control
panel to "ON" position.
3.
According to the character of the load devices, the user can set the mode
MANUAL/LIGHT-
SENSE
on the MPPT
controller.
4.
Optional inverter: please turn on the breaker for inverter.
5.
Optional backup generator set:
a.
Fill in the oil and fuel. Check if the socket connection on the control panel is secured.
b. Turn the key to "ON" positioin.
c. Turn on the circuit breaker inside the generator control cabinet.
d. Manually test the auto-start function of genset: change to manual mode and press "START" button to start the
generator. Stop it when making sure everything is normal and then change to "AUTO" mode.
6.
Backup generator control panel operation:
a.
Set time
Press "SET" to adjust the time. Input required numbers and press "ENT" for confirmation.
19
ELECTRICAL OPERATION