29
CG000542 | Rev A
User Guide | CytAssist Instrument | Menu Overview
Step 2
: Reinitialize the instrument
After installing an update, run a Readiness Test. See
section for further
guidance.
a.
To initiate a Readiness Test, navigate through the menu to System
> Alternate Modes > Readiness Test. OR press the blue Run Start
Button on the touchscreen.
Enter the serial number located on
the
Visium CytAssist Calibration Slide
label.
b.
Locate two blank slides and the
Visium CytAssist Calibration Slide
in
the Instrument Accessory Kit. Clean with compressed air.
c.
Follow onscreen instruction and see
section
to load the blank slides and calibration slide onto the instrument.
d.
Press the blue play button to start the test.
e.
Upon test completion, follow onscreen instruction to unload slides.
Follow onscreen instruction in the event of a failed or incomplete test.
f.
Store the blank slides and the calibration slide in their original
packaging bag, away from sunlight and extreme temperature.
Retain for future use.
g.
Wipe down the Tissue Slide Stage and the Visium Slide Stage
with 70% ethanol or 70% isopropanol and laboratory wipes. Use
compressed air to dry and remove debris as needed.
Clean glass windows with dry polyester swabs (such as Texwipe
TX714A Cleanroom Swab, 0.5”L - EW-33677-62 from Cole-Parmer or
equivalent) and compressed air. Use a bright light (e.g. flashlight)
to inspect the glass windows for any smudges and remove them as
section for more details.
h.
Close the lid (clicking sound indicates closure). Wipe down the base
and lid of the instrument.
i.
The instrument is now ready for use.
Firmware Update
Procedure
contd.
Содержание Visium CytAssist
Страница 5: ...Introduction 6 Introduction 7 Product Identification 7 Product Specifications...
Страница 8: ...Safety Compliance Information 9 Safety 10 Regulatory...
Страница 11: ...System Components 12 System Components 13 Accessory Kits...
Страница 24: ...Menu Options 23 Menu Options 26 Firmware Update Procedure...
Страница 42: ...Maintenance 41 System Maintenance 43 Moving Shipping the Instrument...
Страница 48: ...Troubleshooting 47 Troubleshooting 49 Error Screens...