Installation Instructions

F

2

 DRAIN

FOR USE WITH AQUATIC 2-PIECE FREESTANDING BATHTUBS

STEPS BEFORE FLOOR FINISH

Step 1:

A. 

With the help of the bathtub apron or 
the optional template, mark the center 
of the drainage line in relation with the 
desired position of the bathtub.

B. 

Drill a hole (diameter between 4½'' 
and 6'') to the floor in the previously 
marked position.

Step 2:

A. 

Insert the female side of the slip joint 
until the shoulder of the mounting 
flange and tighten the clamp

.

B. 

Temporarily insert the slip joint's  
male part inside the F² drain and  
insert the prevention cap.

C. 

Use aligning guide points to position 
the flange adjusted parallel to the 
adjacent wall. Fasten the flange in  
the floor.

D. 

Finish connecting to the plumbing 
drain line under the floor. Paste as 
recommended by the plumbing code.

Step 3:

A. 

Using the template or the bathtub skirt 
trace the inside rim of the skirt. Use this 
line as minimal limit for tile installation.

 

 F² Drain video 

Prevention

cap

PARTS INCLUDED

Drain adapter 

(use if required)

Slip joint 

(Female-female)

male

end

female

end

Clamp

Installation 

flange

1A

Floor

Drain position

Desired bathtub position

Inside of the tub

Outside of the tub

Top view

Aligning guide points

2C

Prevention cap

Slip joint 

(Male)

2B

Clamp

Slip joint 

(Female)

Shoulder

Installation flange

2A

Top view

W1AX6032FTO, W1AX6636FTO, W2AX6032FTO, W3AX6042FTO, 

W3AX6636FTO, W4AX6032FTO, W4AX6636FTO

Summary of Contents for F2 Drain

Page 1: ...ion cap C Use aligning guide points to position the flange adjusted parallel to the adjacent wall Fasten the flange in the floor D Finish connecting to the plumbing drain line under the floor Paste as recommended by the plumbing code Step 3 A Using the template or the bathtub skirt trace the inside rim of the skirt Use this line as minimal limit for tile installation F Drain video Prevention cap P...

Page 2: ...the installation is complete see image 5B at the end of this guide Use a straight object for example with a 2x4 to ease the alignment D If the faucet must be installed on the deck of the bathtub do the installation at this stage Step 1 A After finishing the floor tiles etc place the bathtub on the side over cardboard and install the waste overflow without fastening into the final position B Place ...

Page 3: ...ngs and test to prevent leakage NOTE Make sure there is an insulating strip between the deck and the apron Step 3 A Place the apron in the desired position by aligning and inserting the alignment pins of the installation flange in the holes in the apron B Adjust position of the apron Screw the apron to the floor as indicated in the bathtub installation guide Drill 4 holes using a 3 8 drill bit in ...

Page 4: ... from an authorized dealer Any product reported to the authorized dealer or to Aquatic as being defective within the warranty period will be repaired or replaced with a product of equal value at the option of Aquatic This warranty extends to the original owner end user and is not transferable to a subsequent owner Neither the distributor authorized Aquatic dealer nor or any other person has been a...

Reviews: