Chapter 4 Cabinet Installation
Figure 4-21 Fixing the Upper–Layer Cabinet to the Lower–Layer Cabinet
If a heater is installed in the BC8910A cabinet, the heater will cover the M12 bolt
installation holes at the rear of the cabinet. You need to remove the locking screws of
the heater first and then pull out the heater partially before installing M12 bolts. The
power cable of the heater is not required to be removed.
4-19
SJ-20150203110107-011|2016-03-23 (R1.1)
ZTE Proprietary and Confidential