![Zoomlion ZCC1100H Operator'S Manual Download Page 287](http://html1.mh-extra.com/html/zoomlion/zcc1100h/zcc1100h_operators-manual_938545287.webp)
Operator’s Manual for Crawler Crane
Operator’s Manual for Crawler Crane
A
s
s
e
m
b
ly
a
n
d
D
is
m
a
n
tli
n
g
5-81
5.7 Assembly and dismantling of tip boom
A
B
3
1
2
1
Figure 5-71
Assembly of tip boom
The procedures for assembly of tip boom are shown in figure 5-71:
–
Align the upper connecting hole of tip boom with the A hole in main boom head.
–
Insert pin spindle (part 2) and secure it with cotter pin (part 1).
–
Align the lower connecting hole with the B hole in main boom head.
–
Insert pin spindle (part 3) and secure it with cotter pin (part 1).
The procedure for dismantling tip boom is the opposite of assembly.
CAUTION
Slowly raise and lower main boom with tip boom to prevent tip boom against damage
due to the impact brought by jerky operation.
Summary of Contents for ZCC1100H
Page 2: ......
Page 3: ...Edition 1 5 2014 ZCC1100H Crawler Crane Operator s Manual ...
Page 4: ......
Page 6: ......
Page 12: ......
Page 13: ...履带起重机操作手册 第一章 安全操作说明 Operator s Manual for Crawler Crane Chapter 1 Safety ...
Page 14: ......
Page 21: ...履带起重机操作手册 第二章 起重机的描述 Operator s Manual for Crawler Crane Chapter 2 Description of Crane ...
Page 22: ......
Page 80: ......
Page 81: ...履带起重机操作手册 第三章 安全准则 Operator s Manual for Crawler Crane Chapter 3 Safety Guidelines ...
Page 82: ......
Page 139: ...履带起重机操作手册 第四章 起重机的操作 Operator s Manual for Crawler Crane Chapter 4 Crane Operation ...
Page 140: ......
Page 205: ...履带起重机操作手册 第五章 安装说明 Operator s Manual for Crawler Crane Chapter 5 Assembly and Dismantling ...
Page 206: ......