ZCC1100H Crawler Crane
3-31
CAUTION
To travel crawler crane uphill, the following conditions must be observed:
(1) The ground must be able to support possible ground pressure.
(2) The friction coefficient between roadway and track pad must be large enough to
produce enough drive forces.
(3) Slippery ground can cause the crane to slip sideways and move into an
impermissible side incline position. There is a danger of accidents.
(4) The slewing table must be aligned to the crawler carriers and must be secured to
prevent it from turning.
(5) The maximum permissible wind velocity is 9.8m/s.
(6) Side incline is not permitted!
(7) Travel slowly, and perform all acceleration and deceleration motions with utmost
caution.
(8) The transfer from the horizontal to the incline and from the incline to the horizontal
must be made very evenly. The change of gradient must be continuous.
Summary of Contents for ZCC1100H
Page 2: ......
Page 3: ...Edition 1 5 2014 ZCC1100H Crawler Crane Operator s Manual ...
Page 4: ......
Page 6: ......
Page 12: ......
Page 13: ...履带起重机操作手册 第一章 安全操作说明 Operator s Manual for Crawler Crane Chapter 1 Safety ...
Page 14: ......
Page 21: ...履带起重机操作手册 第二章 起重机的描述 Operator s Manual for Crawler Crane Chapter 2 Description of Crane ...
Page 22: ......
Page 80: ......
Page 81: ...履带起重机操作手册 第三章 安全准则 Operator s Manual for Crawler Crane Chapter 3 Safety Guidelines ...
Page 82: ......
Page 139: ...履带起重机操作手册 第四章 起重机的操作 Operator s Manual for Crawler Crane Chapter 4 Crane Operation ...
Page 140: ......
Page 205: ...履带起重机操作手册 第五章 安装说明 Operator s Manual for Crawler Crane Chapter 5 Assembly and Dismantling ...
Page 206: ......