![Zoomlion ZCC1100H Operator'S Manual Download Page 168](http://html1.mh-extra.com/html/zoomlion/zcc1100h/zcc1100h_operators-manual_938545168.webp)
Operator’s Manual for Crawler Crane
C
ra
n
e
O
p
e
ra
tio
n
4-28
4.4.2 Battery master switch
Battery master switch is located in the battery box on the slewing table. Set battery master
switch in “OFF” position during long-time work breaks so as to prevent the electricity of battery
from discharging excessively.
-G2
-G1
Figure 4-28
Position of battery box
-G2
-G1
Figure 4-29 Position of battery master switch
Battery master switch
Battery box
Battery box
Summary of Contents for ZCC1100H
Page 2: ......
Page 3: ...Edition 1 5 2014 ZCC1100H Crawler Crane Operator s Manual ...
Page 4: ......
Page 6: ......
Page 12: ......
Page 13: ...履带起重机操作手册 第一章 安全操作说明 Operator s Manual for Crawler Crane Chapter 1 Safety ...
Page 14: ......
Page 21: ...履带起重机操作手册 第二章 起重机的描述 Operator s Manual for Crawler Crane Chapter 2 Description of Crane ...
Page 22: ......
Page 80: ......
Page 81: ...履带起重机操作手册 第三章 安全准则 Operator s Manual for Crawler Crane Chapter 3 Safety Guidelines ...
Page 82: ......
Page 139: ...履带起重机操作手册 第四章 起重机的操作 Operator s Manual for Crawler Crane Chapter 4 Crane Operation ...
Page 140: ......
Page 205: ...履带起重机操作手册 第五章 安装说明 Operator s Manual for Crawler Crane Chapter 5 Assembly and Dismantling ...
Page 206: ......