![Zoomlion ZCC1100H Operator'S Manual Download Page 269](http://html1.mh-extra.com/html/zoomlion/zcc1100h/zcc1100h_operators-manual_938545269.webp)
Operator’s Manual for Crawler Crane
Operator’s Manual for Crawler Crane
A
s
s
e
m
b
ly
a
n
d
D
is
m
a
n
tli
n
g
5-63
b) Move right control lever to the left to spool up derricking winch until the main boom head is
raised by the derricking rope to a proper position a littler higher than the load hook,
referring to figure 5-56.
Figure 5-56 Rope reeving
c)
Place the load hook directly under main boom head, and then reeve the hoisting rope
between hook block and rope pulley on main boom head in accordance with the rope
reeving plan (for the details, please refer to section 4.6 “rope reeving” in Chapter 4), finally
secure the rope end point with rope lock and rope thimble, referring to the figure 5-57.
Figure 5-57 Reeving in load hook
CAUTION
The working personnel who guide the wire rope should take great care to prevent
against falling down when walking on the boom frame; otherwise, serious accident may
occur.
Summary of Contents for ZCC1100H
Page 2: ......
Page 3: ...Edition 1 5 2014 ZCC1100H Crawler Crane Operator s Manual ...
Page 4: ......
Page 6: ......
Page 12: ......
Page 13: ...履带起重机操作手册 第一章 安全操作说明 Operator s Manual for Crawler Crane Chapter 1 Safety ...
Page 14: ......
Page 21: ...履带起重机操作手册 第二章 起重机的描述 Operator s Manual for Crawler Crane Chapter 2 Description of Crane ...
Page 22: ......
Page 80: ......
Page 81: ...履带起重机操作手册 第三章 安全准则 Operator s Manual for Crawler Crane Chapter 3 Safety Guidelines ...
Page 82: ......
Page 139: ...履带起重机操作手册 第四章 起重机的操作 Operator s Manual for Crawler Crane Chapter 4 Crane Operation ...
Page 140: ......
Page 205: ...履带起重机操作手册 第五章 安装说明 Operator s Manual for Crawler Crane Chapter 5 Assembly and Dismantling ...
Page 206: ......