Crane inspections
Crane inspections
8.2 Re-inspections
8.2 Re-inspections
8.2.1 General
8.2.1 General
This crane has been tested and commissioned at the manufacturer’s facilities prior to
This crane has been tested and commissioned at the manufacturer’s facilities prior to
shipment in accordance with the latest national standards.
shipment in accordance with the latest national standards.
The safety level achieved during initial commissioning may not be attainable during
The safety level achieved during initial commissioning may not be attainable during
operation.
operation.
Examples of the root cause of such deviation include; e.g., rust, corrosion, effects of
Examples of the root cause of such deviation include; e.g., rust, corrosion, effects of
forced operations, changes in the environment and changes to the mode of operation.
forced operations, changes in the environment and changes to the mode of operation.
The inspection frequency varies with the application situations and the operating
The inspection frequency varies with the application situations and the operating
conditions, but the minimum interval is one year. For details, please refer to the relevant
conditions, but the minimum interval is one year. For details, please refer to the relevant
standards of GB3811 and GB/T6068.
standards of GB3811 and GB/T6068.
If the crane is sold to foreign countries or regions, please apply local standards for
If the crane is sold to foreign countries or regions, please apply local standards for
reference.
reference.
There is a risk of weakening the supporting components when major changes or
There is a risk of weakening the supporting components when major changes or
repairs are made to the crane!
repairs are made to the crane!
In such cases, the operator must have the crane inspected by a competent
In such cases, the operator must have the crane inspected by a competent
inspector before putting it back into service.
inspector before putting it back into service.
A competent inspector is someone who has a thorough
A competent inspector is someone who has a thorough understanding of cranes based
understanding of cranes based
on technical training and experience and is knowledgeable about the relevant national
on technical training and experience and is knowledgeable about the relevant national
occupational safety regulations, accident prevention regulations and generally
occupational safety regulations, accident prevention regulations and generally
accepted engineering principles and is able to assess that the crane is safe to operate.
accepted engineering principles and is able to assess that the crane is safe to operate.
A
A professional
professional engineer
engineer is
is someone
someone who
who has
has rich
rich experience
experience in
in designing,
designing,
manufacturing and maintaining lifting equipment (e.g., crane) and is knowledgeable
manufacturing and maintaining lifting equipment (e.g., crane) and is knowledgeable
about the relevant regulations and standards and is able to
about the relevant regulations and standards and is able to use necessary equipment to
use necessary equipment to
inspect, so as to access whether lifting equipment are safe and to determine what
inspect, so as to access whether lifting equipment are safe and to determine what
measures to be taken.
measures to be taken.
Re-inspection of crane is principally a visual inspection, wherein the inspector and
Re-inspection of crane is principally a visual inspection, wherein the inspector and
engineer appraise the condition of the crane and its components. The purpose of the
engineer appraise the condition of the crane and its components. The purpose of the
inspections is to prevent accidents by detecting deficiencies in a timely fashion.
inspections is to prevent accidents by detecting deficiencies in a timely fashion.
A
A number
number of
of important
important examples
examples of
of items
items that
that are
are particularly
particularly important
important during
during the
the
periodic crane inspections are listed in the following: We wish to advise that only
periodic crane inspections are listed in the following: We wish to advise that only
competent inspector and professional engineer take sole responsibility for the
competent inspector and professional engineer take sole responsibility for the
inspections that they carry out. This chapter does not necessary cover the entire scope
inspections that they carry out. This chapter does not necessary cover the entire scope
Warning
Warning
Summary of Contents for QY30V
Page 8: ......
Page 10: ......
Page 36: ......
Page 56: ......
Page 94: ......
Page 144: ...04 49 04 49 Operation crane superstructure Operation crane superstructure Fig 04 40 Fig 04 40...
Page 146: ......
Page 156: ...05 9 05 9...
Page 158: ......
Page 170: ......
Page 202: ......
Page 242: ...08 39 08 39 M60 M60 66 66 1008 1008 1418 1418...
Page 244: ......
Page 272: ...09 27 09 27...
Page 274: ......