07-20
07-20
M a i n t e n a n c e a n d s e r v i c e
M a i n t e n a n c e a n d s e r v i c e
S e r .
S e r .
N o .
N o .
O p e r a
O p e r at i n g
t i n g s t e p s
s t e p s
P o i n t s
P o i n t s f o r
f o r a t t e n t i o n
a t t e n t i o n
T o o l s
T o o l s
r e q u i r e d
r e q u i r e d
13
13
Reeve the wire rope on the drum
Reeve the wire rope on the drum
with a load whose weight is 30%
with a load whose weight is 30%
of the max. permissible lifting
of the max. permissible lifting
capacity per strand.
capacity per strand.
Weight of the load: W = 0.3 NP
Weight of the load: W = 0.3 NP
Rope reeving: N
Rope reeving: N
Max. permissible lifting capacity
Max. permissible lifting capacity
per strand: P
per strand: P
The max. permissible lifting
The max. permissible lifting
capacity can not be
capacity can not be
exceeded.
exceeded.
Hand
Hand
hammer and
hammer and
wrench
wrench
14
14
Unload
Unload the
the load
load from
from main
main hook.
hook.
—
— Adjusting the
Adjusting the wire
wire rope
rope for ma
for main boom
in boom
If the telescopic boom section 4 or the telescopic boom section 3 cannot be fully
If the telescopic boom section 4 or the telescopic boom section 3 cannot be fully
telescoped in, the boom extension / retraction rope may be not properly rectified. At
telescoped in, the boom extension / retraction rope may be not properly rectified. At
this time, adjust the wire rope according to the following methods:
this time, adjust the wire rope according to the following methods:
a)
a) Adjusting the
Adjusting the boom re
boom retraction
traction rope
rope for top
for top boom se
boom section
ction
1)
1) Open the
Open the cover on
cover on the head of
the head of top boom s
top boom section to
ection to reveal the
reveal the nut at
nut at the
the
end of boom retraction rope. Please refer to Fig. 07 – 07;
end of boom retraction rope. Please refer to Fig. 07 – 07;
2)
2) Remove the
Remove the locking nut,
locking nut, and then
and then screw
screw down the
down the adjusting nut
adjusting nut with the
with the
socket wrench until the boom extension rope II is just tightened.
socket wrench until the boom extension rope II is just tightened.
Summary of Contents for QY30V
Page 8: ......
Page 10: ......
Page 36: ......
Page 56: ......
Page 94: ......
Page 144: ...04 49 04 49 Operation crane superstructure Operation crane superstructure Fig 04 40 Fig 04 40...
Page 146: ......
Page 156: ...05 9 05 9...
Page 158: ......
Page 170: ......
Page 202: ......
Page 242: ...08 39 08 39 M60 M60 66 66 1008 1008 1418 1418...
Page 244: ......
Page 272: ...09 27 09 27...
Page 274: ......