![Zoomlion QY30V Manual Download Page 118](http://html1.mh-extra.com/html/zoomlion/qy30v/qy30v_manual_938532118.webp)
04 - 23
04 - 23
g)
g) Remain
Remain the com
the communication
munication between the
between the operator
operator and the
and the rigger.
rigger.
Operation – crane superstructure
Operation – crane superstructure
In order to p
In order to p rotect t
rotect t he crane and reduce the danger of accidents, always operate
he crane and reduce the danger of accidents, always operate
the joysticks slowly and sensitively.
the joysticks slowly and sensitively.
Ensure that there are no obstacles in the crane working area and no persons in
Ensure that there are no obstacles in the crane working area and no persons in
danger zone. Give a short warning signal (horn) before starting a crane
danger zone. Give a short warning signal (horn) before starting a crane
movement.
movement.
4.
4.5.
5.2 Outrigg
2 Outrigg er – operation
er – operation
The outrigger control devices, consisting of accelerator control switch, outrigger control
The outrigger control devices, consisting of accelerator control switch, outrigger control
levers and level gauge, are attached to both sides of chassis frame of the vehicle. You can
levers and level gauge, are attached to both sides of chassis frame of the vehicle. You can
operate the control levers to extend or retract the outriggers simultaneously or
operate the control levers to extend or retract the outriggers simultaneously or
independently. See Fig. 04 – 14.
independently. See Fig. 04 – 14.
Fig. 04 – 14
Fig. 04 – 14
Extend outrigg
Extend outrigg ers before crane opera
ers before crane operation. Sele
tion. Select even and hard wo
ct even and hard wo rking
rking sites. If the
sites. If the
working site is soft or uneven, put suitable materials and bases beneath the
working site is soft or uneven, put suitable materials and bases beneath the
outrigg
outrigg er pads.
er pads.
–
–
Out
Out ri
ri gg
gg er c
er c on
on tr
tr ol
ol lev
lev ers
ers
Outrigger control levers are shown in Fig. 04 – 15.
Outrigger control levers are shown in Fig. 04 – 15.
a)
a) Outrigger
Outrigger control directi
control direction illustrations
on illustrations and points
and points for attention
for attention are printed
are printed in
in
the outrigger control label;
the outrigger control label;
Warning
Warning
Danger
Danger
Warning
Warning
Summary of Contents for QY30V
Page 8: ......
Page 10: ......
Page 36: ......
Page 56: ......
Page 94: ......
Page 144: ...04 49 04 49 Operation crane superstructure Operation crane superstructure Fig 04 40 Fig 04 40...
Page 146: ......
Page 156: ...05 9 05 9...
Page 158: ......
Page 170: ......
Page 202: ......
Page 242: ...08 39 08 39 M60 M60 66 66 1008 1008 1418 1418...
Page 244: ......
Page 272: ...09 27 09 27...
Page 274: ......