  1.  Review the drawing in Fig. 3 on page 8 and the actual system to 

become familiar with the components in the packaged grinder pump 

system.  Review where the unit will be installed.  Determine where 

the power feed, inlet pipe, and discharge pipe will be located.

  2.  Remove the unit from packing.  Prepackaged outdoor systems 

are preassembled at the Zoeller Company and require a minimum 

of field assembly work.  Float switches are set and tethered for 

proper operation from the Factory.  Systems using an automatic 

unit, WD or WH series, have an integral “on/off” float switch.  

See Fig. 4 on page 5 for adjustment instructions.  The alarm 

switch should be located 3” above the pump “on” level.  Three 

float systems used with a control panel are placed at 27”, 24”, 

and 15” from the bottom of the basin.  Four float systems used 

with a control panel are placed at 33”, 27”, 24”, and 15” from the 

bottom of the basin. If the invert location is at or below the level 

of the float switches, contact the factory.  

  3.  Float switches are tied in place for shipping purposes on all model 

prepackaged systems.  Cut the cable tie around each float switch 

bulb or the unit will not operate properly.  Verify that where the float 

switches are set will work for your application.  

Verifying that the 

float switches are set properly and will not hang up inside 

the basin is the responsibility of the installing contractor. 

  4.  Dig a hole for the basin.  The hole should be at least 24” larger 

in diameter than the basin diameter to provide 12” of backfill all 

around and deep enough to provide either 12” of compacted 

backfill or 6” when a concrete pad is required.  

Note:  Care must 

be taken when excavating in order to avoid underground 

utilities and disturbance of existing structure foundations.  

The hole should be located at least ten feet from adjacent 

structures.  Additional distance may be required to sufficiently 

locate the basin outside of the loading area of the adjacent 

structures.

  5.  The location of the inlet hub is determined by the depth of the inlet 

pipe.  The inlet hub must be used with 4” pipe.  It is best to install 

the inlet on the side of the basin opposite the float switches.  To 

install, use a 4” hole saw to drill into the side of the basin at the 

correct elevation.  Center the hub inner diameter with the hole 

in the basin.  Attach the hub to the side of the basin using the 

sealant and hardware provided.

  6.  The bottom of the excavation can now be properly backfilled, 

compacted and leveled.  Set basin in hole.  Ensure the removable 

cover extends above the finished grade line and the grade slopes 

away from the unit.  Backfill and subbase should be 1/8” –3/4” pea 

gravel or 1/8” –1/2” crushed stone.  (Reference basin installation 

instructions included with unit.)  Connect the 4” inlet pipe to the 

inlet hub.  

  7.  Pouring a concrete anchor around system can now be completed.  

Basin should be filled with water when pouring concrete to minimize 

movement of the system.  Backfill around basin with specified media.  

Care should be used to avoid damaging components or leaving 

voids when back filling.  Refer to Basin installation reference guide 

on more specific requirements.

  8.  PVC or HDPE discharge piping is connected to the 2” threaded 

fitting located in the basin sidewall.  Support discharge piping with 

sufficient backfill.

  9. Connect lift cable to top of pump.  Lower the pump into basin 

ensuring the discharge pipe bracket slides into the disconnect 

fitting.

 10.

 Note:  The grinder basin is a sewage holding tank.  Vent 

connection should be installed in accordance with all national, 

state and local plumbing codes.

  11.  Dig a trench for the electrical conduit.  The conduit should be located 

below the frost line.  Follow all applicable electrical codes.

 12.  If using a junction box, connect the electrical conduit and wiring 

according to instructions included in this manual and wiring diagram 

in box.  If a potting kit is provided with the junction box,  follow the 

instructions for sealing the conduit connection to the junction box. 

If a potting kit is not provided, the conduit connection to the junction 

box must be sealed.

 13.  Mount the control panel within sight of the system.  Connect float 

switches and pump cords according to the “Pump Wiring Instructions” 

found later in this manual and located inside the panel enclosure.

 14.  Remove any debris from the basin.  Using clean water, check the 

system for proper operation.

 15.  Seal and secure the lid using the proper bolts and sealant when 

using a lid without a formed gasket. 

 16.  Test system for leaks and proper pump operation.
 17.  Record system start up data for future reference.

This set of instructions is for factory prepackaged outdoor grinder systems only.  If this is a field assembled outdoor system 

you can use these instructions as a guideline.  If this is an indoor system then go back to pages 6-7 in this manual that covers indoor systems.

Summary of Contents for SHARK 818 Series

Page 1: ...ntents Safety Instructions 1 Limited Warranty 2 Preinstallation Checklist 3 General Information 4 Pump Wiring Instructions 5 Typical Indoor Prepackaged System 6 Indoor Prepackaged Installation Instructions 7 Typical Outdoor Prepackaged System 8 Outdoor Prepackaged Installation Instructions 9 Operation 10 Cutter Maintenance 11 Service Checklist 12 Safety Instructions TO AVOID SERIOUS OR FATAL PERSO...

Page 2: ... user or 18 months from date of original manufacture of the product whichever comes first Parts that fail within the warranty period one year from date of purchase by the end user or 18 months from the date of original manufacture of the product whichever comes first that inspections determine to be defective in material or workmanship will be repaired replaced or remanufactured at Manufacturer s ...

Page 3: ... grinder pump or other pit peculiarities and are secured so that the grinder pump will shut off It is recommended to use rigid pipe and fittings and the pit be 24 in diameter for simplex systems and 36 in diameter for duplex systems or larger 4 Grinder installations should be checked yearly for debris and or build up which may interfere with the ON or OFF positions of variable level float controls...

Page 4: ...ust comply with the National Electrical Code and applicable local codes Conduit and panel enclosure openings must have a gas and watertight seal Installation of electrical panels conduit and connections should be made by a qualified licensed electrician A UL Listed potting kit P N 10 2350 is available from Zoeller Company 4 When installing a pump with a check valve or a rail system with a check va...

Page 5: ...iagram above to secure the float switch properly and obtain the proper tether to customize the on off cycle to each application Note the minimum off level shown above On Prepackaged Systems the tether length is set at 5 Determining Pumping Range in Inches 1 inch 2 5 cm Tether Length 5 10 15 20 22 Pumping Range 9 13 5 18 22 24 Use only as a guide Due to weight of cable pumping range above horizonta...

Page 6: ...4 STEEL CORD SEAL INSPECTION PLATE 3 GROMMET SEAL SWITCH CORD ALARM FLOAT BASIN COVER LIFTING BOLT 16 X 1 4 STEEL 5 16 304 STAINLESS STEEL PUMP PLATE PUMP POWER CORD SILENCE INPUT 1 POWER ON FIELD INSTALLED ALARM 4 RUBBER INLET CAST IRON ADAPTERS OFF 24 NOMINAL TO ALARM PANEL BALL VALVE FIELD INSTALLED GALVANIZED PIPE 1 1 4 X 32 GALVANIZED PIPE 1 1 4 X 12 GRINDER PUMP SINGLE PHASE 2HP 1 1 4 GROMME...

Page 7: ...n a very low traffic area within 15 of the power disconnect The hole should be at least 8 larger in diameter than the basin in order to leave 4 of backfill all the way around the perimeter A minimum of 4 of compacted subbase is also required Backfill and subbase should be 1 8 to 3 4 pea gravel or 1 8 to 1 2 crushed stone Also reference the basin installation instructions included with the unit 6 T...

Page 8: ... AFD 1 25 2 Z RAIL 2 CAST IRON CHECK VALVE 3 4 GALV GUIDE RAILS 2 SCH 80 BALL VALVE 2 FLEX BOOT FITTING LOCATION VARIES WITH BASIN DEPTH FLOAT TREE ASSEMBLY 2HP GRINDER PUMP 2 PVC SCH 80 PLBG 1 8 302 STAINLESS STEEL LIFTING CABLE ALARM ON OFF SOLID FIBERGLASS COVER HIGH WATER ALARM OR SIMPLEX CONTROL PANEL FIELD INSTALLED ALARM FLOAT SWITCH MUST OPERATE OFF LOW VOLTAGE TO BE USED WITH QWIK BOX SK3...

Page 9: ...iameter with the hole in the basin Attach the hub to the side of the basin using the sealant and hardware provided 6 The bottom of the excavation can now be properly backfilled compactedandleveled Setbasininhole Ensuretheremovable cover extends above the finished grade line and the grade slopes awayfromtheunit Backfillandsubbaseshouldbe1 8 3 4 pea gravel or 1 8 1 2 crushed stone Reference basin in...

Page 10: ...nd securely installed Floats positioned properly Discharge valves open 3 16 vent hole drilled in pipe between check valve and pump Once the above has been verified proceed with the following checks Pump power cables and control floats properly installed and voltage verified Conduit connections to panel and junction box are properly sealed After installing the pump into the containment area with ad...

Page 11: ...by surface grinding both disc and cutter to a 32 micro finish Do not attempt grinding in the field Send parts to a qualified machine shop or return to the factory for repair The disc cutter and shims are a matched set Keep parts together Measure disc before and after resurfacing with micrometer and record measurements 7 Afterresurfacing thediscandcuttermustbeflatwithin0 001 If the disc has been su...

Page 12: ... always disconnect pump and panel from its power source before handling Neverenterthebasinuntilithasbeenproperlyvented and tested Any person entering a basin should be wearing a harness with safety rope extending to the surface so that they can be pulled out in case of asphyxiation Sewage water gives off methane and hydrogen sulfide gases both of which can be highly poisonous Installationandchecki...

Reviews: