background image

4

© Copyright 2014 Zoeller Co. All rights reserved.

CONDITION

pOSSIBLE CaUSE

REMEDy

a.  pUMp WILL NOT STaRT OR RUN

Low voltage, blown fuse, open circuit

Have a qualified electrician check fuse and circuit.

Impeller bound

Contact a Zoeller Service Station.

Motor or wiring shorted
Debris on float switch

Remove debris.

B.   pUMp STaRTS TOO SOON

Float “ON” point is adjusted too low

Raise the float stops, make sure the float is between the two stops. 

C.  WaTER LEVEL EXCESSIVE BEfORE pUMp TURNS ON

Float “ON” point adjusted to high

Lower the upper float stop.

D.  pUMp WILL NOT SHUT Off OR RUNS TOO LONg BEfORE 

WaTER IS pUMpED

Debris under float

Remove debris from around float.

Faulty float switch

Contact a Zoeller Service Station.

Float “Off” point adjusted too low

Raise the lower float stop.

Pump is air locked

Make sure vent hole in discharge pipe is clear.

Water level too low

Raise the lower float stop.

Waste material has accumulated blocking flow of material 

to pump intake.

Hold flush handle down on toilet for 15 seconds. If unit will not 

clear, unplug and wait 30 minutes. Plug unit back in and repeat. 

If unit still will not turn off, it will need to be opened and the 

debris relocated.

E.  pUMp OpERaTES BUT 

        DELIVERS LITTLE OR NO WaTER

Debris around intake

Clean area around intake.

Blockage in discharge pipe

Remove pipe and flush out debris.

Low or incorrect voltage

Have a qualified electrician check house wiring.

Damaged Impeller

Contact a Zoeller Service Station.

Incorrect float adjustment

Contact Product Support Department.

Pump is air locked

Make sure vent hole in discharge pipe is clear.

Vertical lift too high

Change discharge piping or contact Product Support Department.

SK2844

DIMENSIONS

TROUBLE SHOOTING

If the above checklist does not solve the problem, consult the Zoeller Product Support Department at +1 (502) 778-2731.  

Do not

 attempt to service or otherwise disassemble pump. 

 

Before servicing a pump, always shut off the main 

power breaker and then unplug the pump - making sure you 

are not standing in water and are wearing insulated protective 

sole shoes. Under flooded conditions, contact your local electric 

company or a qualified, licensed electrician for disconnecting electrical 

service prior to pump removal. 

 Submersible pumps contain oil which become pressured 

and hot under operating conditions. 

Allow 2½ hours after disconnecting 

before attempting service.

CAUTION

 Do not dispose of feminine sanitary products, disposable 

diapers, dish rags, etc. in the QWIK JON

®

 ULTIMA . They may jam the 

pump or other plumbing lines and cause malfunction. 

CARE OF FINISH:

 Soap and water is all that is recommended for cleaning 

the outside of the tank. Other cleaning products may cause discoloration 

and scratching.

[18 5/8”]

[20 1/8”]

[1 3/4”]

[14 1/2”]

[7”]

[12 3/4”]

[15 1/2”]

[9”]

[9 3/16”]

[2 7/8”]

[3 1/2”]

47.3cm

 22.9cm

23.3cm

36.8cm

4.4cm

51.1cm

7.3cm

17.8cm

39.4cm

32.4cm

8.9cm

Summary of Contents for QWIK JON ULTIMA 202

Page 1: ...1 28 or 1 6 gallons per flush 5 All fixtures connecting to the system must be on the same floor level 1 To reduce the risk of electrical shock a properly grounded receptacle or control box must be in...

Page 2: ...ABILITY SHALLBELIMITEDTOTHEDURATIONOFTHEEXPRESSEDWARRANTY Some jurisdictions do not allow limitations on the duration of an implied warranty so the above limitation may not apply to you Some jurisdict...

Page 3: ...on Ultima Sewage Removal System 202 1001 202 1005 202 1002 202 1003 202 1010 202 1006 202 1012 2 Replacement pump with discharge pipe 150872 151965 151965 151895 152167 151966 152296 3 Tank cover with...

Page 4: ...ow or incorrect voltage Have a qualified electrician check house wiring Damaged Impeller Contact a Zoeller Service Station Incorrect float adjustment Contact Product Support Department Pump is air loc...

Page 5: ...er sharp objects do not puncture the pump unit Level the pump unit to within 3 mm 1 8 using hydraulic cement or similar material SK2589 STEP 3 ROUGH IN 1 Position the pump unit a minimum of 3 mm 1 8 f...

Page 6: ...out using a 44 mm 1 hole saw This is to ensure there is no leakage problems from inlets not in use When utilizing side inlets install a check valve on the incoming line SK2591 DRILL POINT 1 1 2 SLIP I...

Page 7: ...m 220 DN25 1 pipe max 149 m 489 DN20 pipe max 119 m 390 DN25 1 pipe max 218 m 715 DN20 pipe max 171 m 561 2 m 6 5 4 m 13 50 Hz 60 Hz 1 5 m 5 3 m 10 4 m 13 5 m 15 1 DN25 1 PIPE MAX 146m 479 DN20 3 4 P...

Page 8: ...Member States relating to Pump Conforms to Machinery Directive 2006 42 EC Standards used EN 809 1998 Electromagnetic Compatibility 2004 108 EC Standards used EN 61000 3 2 EN 61000 3 3 and EN 55014 1...

Reviews: