background image

5

© Copyright 2014 Zoeller Co. All rights reserved.

QWIK JON

®

 

ULTIMA QWIK REFERENCE GUIDE

  STEp 1 

LOCaTION SELECTION

plan your new installation carefully.
floor:

 The floor should be structurally sound and level within 3 mm (1/8"). If the 

floor is not level, use hydraulic cement or similar material to level the floor.

Water:

 A water supply will be needed to operate the toilet. Usually a DN15 (1/2") 

line with a shut-off valve is sufficient.

Electrical:

 A receptacle of the appropriate voltage will be needed to supply electrical 

power to the pump.

Sewage:

 Access to a sewage line is required. The Qwik Jon

®

 Ultima requires a DN25 

(1" ) (or DN20 [3/4"] if your codes permit) sewage discharge line to connect to an 

existing sewage line. A ball or gate valve should be installed in the discharge line.

Vent:

 Access to a vent pipe is required. The use of a mechanical vent system is 

NOT recommended as the toilet will not flush.

NOTE:

 If a built-in installation is to be used, locate the pump unit in an area that 

will allow access to the pump and switch.

OUTLET

WATER

SUPPLY

DISCHARGE

PIPE

VENT

PIPE

LEVEL FLOOR

BALL OR GATE VALVE

SOLD SEPARATELY.

SK2588

  STEp 2 

LEVELINg Of pUMp UNIT

CAUTION

 

Do not use wooden shims to level the pump unit!

CAUTION

 Ensure that nails, screws or other sharp objects do not puncture the pump unit!

Level the pump unit to within 3 mm (1/8") using hydraulic cement or similar material.

SK2589

  STEp 3 

ROUgH-IN

 

1) 

Position the pump unit a minimum of 3 mm (1/8") from the wall 

with the inlet facing forward. Attach the bellows to the inlet using 

the worm drive clamp provided.

  2) 

Place the toilet in front of pump unit aligning the discharge of the 

toilet with the inlet of the pump unit. Make sure that the bellows 

will bridge the gap adequately for final installation. The toilet 

tank should be a minimum of 13 mm (1/2") from the wall.

  3) 

Lightly mark the locations of the pump unit, toilet and closet 

bolt locations on the floor. Lightly mark the wall with the height 

of the pump unit and the  bottom and sides of the toilet tank to 

ensure against interference from pipe runs later.

  4) 

Remove the toilet from the pump unit and set it aside.

SK2590

(STAND-ALONE INSTALLATION)

(BEHIND-THE-WALL INSTALLATION)

 

1) 

Installing  the grinder unit behind  a wall will require an 

extension kit (P/N 10-3050) sold separately. 

  2) 

Place the toilet assembly a minimum of 13 mm (1/2") from 

the wall and mark the closet bolt locations on the floor.

  3) 

Measure the appropriate length of DN90 (3½") Schedule 

40 PVC pipe provided with the extension kit and cut it to 

length. See sketch below.

  4) 

Set toilet aside.

 

CAUTION

  Toilet  assembly  is  top  heavy.  Take  special 

precautions to ensure that toilet does not tip over and break.

SK2634

Summary of Contents for QWIK JON ULTIMA 202

Page 1: ...1 28 or 1 6 gallons per flush 5 All fixtures connecting to the system must be on the same floor level 1 To reduce the risk of electrical shock a properly grounded receptacle or control box must be in...

Page 2: ...ABILITY SHALLBELIMITEDTOTHEDURATIONOFTHEEXPRESSEDWARRANTY Some jurisdictions do not allow limitations on the duration of an implied warranty so the above limitation may not apply to you Some jurisdict...

Page 3: ...on Ultima Sewage Removal System 202 1001 202 1005 202 1002 202 1003 202 1010 202 1006 202 1012 2 Replacement pump with discharge pipe 150872 151965 151965 151895 152167 151966 152296 3 Tank cover with...

Page 4: ...ow or incorrect voltage Have a qualified electrician check house wiring Damaged Impeller Contact a Zoeller Service Station Incorrect float adjustment Contact Product Support Department Pump is air loc...

Page 5: ...er sharp objects do not puncture the pump unit Level the pump unit to within 3 mm 1 8 using hydraulic cement or similar material SK2589 STEP 3 ROUGH IN 1 Position the pump unit a minimum of 3 mm 1 8 f...

Page 6: ...out using a 44 mm 1 hole saw This is to ensure there is no leakage problems from inlets not in use When utilizing side inlets install a check valve on the incoming line SK2591 DRILL POINT 1 1 2 SLIP I...

Page 7: ...m 220 DN25 1 pipe max 149 m 489 DN20 pipe max 119 m 390 DN25 1 pipe max 218 m 715 DN20 pipe max 171 m 561 2 m 6 5 4 m 13 50 Hz 60 Hz 1 5 m 5 3 m 10 4 m 13 5 m 15 1 DN25 1 PIPE MAX 146m 479 DN20 3 4 P...

Page 8: ...Member States relating to Pump Conforms to Machinery Directive 2006 42 EC Standards used EN 809 1998 Electromagnetic Compatibility 2004 108 EC Standards used EN 61000 3 2 EN 61000 3 3 and EN 55014 1...

Reviews: