6
© Copyright 2014 Zoeller Co. All rights reserved.
STEp 4
pIpINg
1)
Cut and dry-fit the pipe and fittings as required for DN25 (1") diameter
discharge pipe (may be reduced to DN20
[
¾"
]
diameter if codes permit).
2)
While dry-fitting the discharge pipe, position and mark the location of
the pump unit discharge fitting.
3)
Cut and dry-fit DN40 (1½") vent pipe as required to ensure that the vent
pipe does not interfere with other components. Make the connection to
the pump unit with the provided street elbow. A 2" x 1" 90° discharge
fitting has been provided. However, it may be easier to pipe straight
up depending on the installation.
CAUTION
Proper venting is required. Do not use a mechanical
type vent.
4)
Temporarily set the toilet in place to check that there is no piping
interference. Remove the toilet and set it aside.
5)
Clean, prime and solvent weld the discharge piping and pump unit
discharge fitting.
CAUTION
When applying solvent weld to discharge fitting, ensure that
none gets into the check valve assembly. Pay close attention to the proper
alignment of the discharge fitting previously marked.
6)
Clean and solvent weld vent piping as required for proper venting.
Note:
Adding other bathroom fixtures - The Qwik Jon
®
Ultima is designed to
accept additional bathroom fixtures utilizing the two side inlets. These inlets
can be attached via the 2" MPT (outside diameter) or the 1½" slip (inside
diameter). These inlets must have the inner portion drilled out using a 44 mm
(1¾") hole saw. This is to ensure there is no leakage problems from inlets not
in use. When utilizing side inlets, install a check valve on the incoming line.
SK2591
DRILL POINT
1-1/2" SLIP INSIDE
2" MPT OUTSIDE
SK2586
SK2589
1) Install the closet bolts at the points marked earlier.
2) Place the toilet assembly over the closet bolts. Install the anchoring
hardware and tighten in an alternating pattern. Check for level and shim
as required. Be careful when tightening bolts or nuts against china to
avoid cracking the china.
3) Install rubber bellows onto the toilet discharge and grinder tank hub
and secure with the worm clamps provided for installation. See sketch
in Step 3. For built-in installation, install the rubber couplings to both
the grinder tank and the toilet discharge and secure to extension pipe
with worm clamps provided. See sketch in Step 3.
4) Install the water supply line from the existing water shut-off valve to the
toilet water supply connection.
5) Open the water supply valve and check for leaks. The toilet tank should
fill to the proper level. Adjust if required.
6) Plug the pump's power cord into the outlet.
7) Flush the toilet and watch for proper operation. Listen for the pump to
start. The pump unit requires proper venting in order for toilet to flush.
Check for leaks.
8) Repeat flush cycles to assure proper operation.
FLOOR LEVEL TO WITHIN 3 mm (1/8")
PUMP UNIT
AUX. INLET
WATER
SUPPLY
OUTLET
DISCHARGE
PIPE
VENT PIPE
(PER ALL CODES.
DO NOT USE
MECHANICAL VENT.)
SK2595
STEp 5
TOILET INSTaLLaTION (TOILET SUppLIED By OTHERS)
DO NOT PUT GLUE
IN THIS AREA
NOTE:
May not be pictured exactly as shown.