PREINSTALLATION  CHECKLIST  -  ALL  INSTALLATIONS

1. 

   Inspect your pump.

 Occasionally, products are damaged during shipment. If the unit is damaged, contact your dealer 

before using. 

Do Not

 remove the test plug in the cover.

2.

    Carefully read the literature

 provided to familiarize yourself with specific details regarding installation and use. These 

materials should be retained for future reference.

Product information presented 

here re 

 

e

m

it 

t

a

 s

n

oi

t i

n

o

st

c

of  publication. Consult factory 

 r

o

 s

ei

n

p

e

r

si

d

 

g

ni 

d

r

a

e

r

.s

ei

n

e

t s

is 

n

o

ni

Notice to Installer:  Instructions must remain with installation.

INSTALLATION INSTRUCTIONS

Visit our web site:

zoellerpumps.com

50 Hz

910 Package System

SEE BELOW FOR

LIST OF CAUTIONS

SEE BELOW FOR

LIST OF WARNINGS

REFER TO WARRANTY ON PAGE 2.

 

1.

2.

 

To reduce the risk of electrical shock, a properly grounded receptacle or control box 

must be installed in accordance with the governing codes.  Never remove ground pin 

Make certain that the receptacle is within the reach of the pump’s power supply cord.

DO NOT USE AN EXTENSION CORD. Extension cords that are too long or too light

do not deliver sufficient voltage to the pump motor. But more important,they could 

present a safety hazard if the insulation were to become damaged.

from plug.

 

  3.  Make sure the pump's electrical supply circuit is equipped with fuses or circuit breakers 

of proper capacity.   A separate branch circuit is recommended, sized according to the 

governing electrical codes for the current shown on the pump name plate.

  4.  

Testing for ground.

   As a safety measure, each electrical outlet should be checked 

for ground using a circuit analyzer which will indicate if the power, neutral and ground 

electrician.

  5.  FOR YOUR PROTECTION, ALWAYS DISCONNECT PUMP FROM ITS POWER 

SOURCE BEFORE HANDLING.  If pump is wired direct, de-energize the circuit at the 

control box.  DO NOT, UNDER ANY CIRCUMSTANCES, REMOVE THE GROUND 

PIN.  Wear insulated protective shoes and do not stand in water.  Pumps equipped 

with a grounded plug are designed to help protect against electrical shock.  A properly 

grounded receptacle or control box must be installed in accordance with governing 

codes.  

   6.  Installation and servicing of the pump's electrical circuits and hardware should only be 

  7.  Installation and maintenance of this appliance is not intended for persons (including 

children) with reduced physical, sensory or mental capabilities, or lack of experience 

or knowledge, unless they have been given supervision or instruction concerning use 

of the appliance by a person responsible for their safety.

  8. 

Risk of electrical shock.

  Do not remove power supply cord and strain relief or connect 

conduit directly to the pump.  If the supply cable is damaged, it must be replaced by an 

authorized Zoeller Representative.

  9.  Pump may contain oil which becomes pressurized and hot when operating.

Allow 2-1/2 hours after disconnecting before attempting service.

 10.  Pump is not intended for potable water due to possible contamination by oil contained 

in the pump.

 11. 

Risk of electric shock.

  These pumps have not been investigated for use in swimming 

pools and marine areas.

  1.  This unit is not designed to handle any material larger than the pump's solids-passing 

ability.

     

•  

Model 49 and the 70 and 80 series pumps are designed to pass  9 mm (3/8" )   

        spherical solids.

     

   50 and 90 series,140, 371, 372 model pumps are designed to pass 12 mm  

         (1/2") spherical solids.

     

 130 series pumps are designed to pass 15 mm (5/8") spherical solids.

     

• 145 and 373 models and the 150, 160 and 180 se

ries pumps are designed to   

            pass 19 mm (3/4") spherical solids.

     

•  422, 4290 series pumps are designed to pass 37 mm (1-1/2") spherical solids.

     

•  200 series sewage pumps are designed to pass 

50 mm (2") spherical solids.

  2.  Check to be sure your power source is capable of handling the voltage requirements 

3. All plumbing (discharge and vent lines) must be installed to meet local codes. Unit must

be vented. DO NOT USE AN AUTOMATIC PLUMBING VENT DEVICE SIMILAR TO A

”PROVENT”. Some states require this product to be installed by a licensed plumber. 

of the motor, as indicated on the pump name plate.

  4. 

party, 

apparatus or pit peculiarities and is secured so that the pump will shut off.  It is recommended 

arger in diameter.

  5. 

capable of handling various sizes of solid waste be of the bottom intake design to 

reduce clogging and seal failures.  If a check valve is incorporated in the installation, 

a 5 mm (3/16") vent hole must be drilled in the discharge pipe below the check 

valve and pit cover to purge the unit of trapped air.  Vent hole should be checked 

periodically for clogging.  The vent hole on a High Head application may cause too 

much turbulence. You may not want to drill one. If you choose not to drill a vent hole, 

be sure the pump case and impeller is covered with liquid before connecting the pipe 

to the check valve. NOTE: THE HOLE MUST BE BELOW THE BASIN COVER AND 

CLEANED PERIODICALLY. Water stream will be visible when pump is operating.

 

6.  Pump should be checked frequently for debris and/or build up which may interfere 

 

7.  Maximum operating temperature for standard model pumps must not exceed 54 °C 

(130 °F) for cast iron pumps, or 40 °C (104 °F) for pumps with plastic motor housings.

 

8.  Do not operate a pump in an application where the Total Dynamic Head is less than 

the minimum Total Dynamic Head listed on the Pump Performance Curves.

   9.

   10.
   11.

  For health reasons, do not unplug, turn off, or disable pump and use pump tank system 

CHECK VALVE MUST BE USED TO REDUCE UNNECESSARY CYCLING OF PUMP.
This system must be installed above the water table. Groundwater outside the basin will 

cause it to collapse.

SEWAGE / GRINDER

EFFLUENT/SUMP/DEWATERING

49, 53, 55, 57, 59, 72, 76, 86, 88, 98,137, 139,140, 4140, 145, 4145 

152, 153, 161, 162, 163, 165, 185, 189, 371, 372, 373

222, 264, 266, 267, 268, 270, 4270, 271, 4271, 282, 292, 293, 294, 4290, 4291,422
807, 2702, 2722

Summary of Contents for 910

Page 1: ...maged it must be replaced by an authorized Zoeller Representative 9 Pump may contain oil which becomes pressurized and hot when operating Allow 2 1 2 hours after disconnecting before attempting servic...

Page 2: ...onsult the factory Do not attempt to service or otherwise disassemble pump Service must be performed by an authorized Zoeller Company representative SERVICE CHECKLIST EASY DO S DON T S FOR INSTALLING...

Page 3: ...ions with warranty after installation This product must be installed in accordance with National Electric Code ANSI NFPA 70 so as to prevent moisture from entering or accumulating within boxes conduit...

Page 4: ...N COVER AND CLEANED PERIODICALLY High Head unit see 3 under Caution on front page Water stream will be visible from this hole during pump run periods mechanism s Use full size discharge pipe Basin mus...

Page 5: ...nnection Check valve Ball valve Inlet hub 2 Pipe 2 Pipe Union 600 mm 23 19 32 Length 90 mm 3 1 2 Coupling Length 200 mm 7 7 8 For reference only 2 BSPT slip 2 NPT slip or 2 Pipe 2 BSPT slip 2 NPT slip...

Page 6: ...pe seal Vent adaptor Discharge pipe seal Cord seal For alarm 2 Union Check valve 2 turn DN50 Length 90 mm 3 1 2 Length 762 mm 30 DN100 2 NPT slip x 2 or 1 1 4 NPT slip x 1 Inlet hub Discharge pipe sea...

Page 7: ...ailure to follow these precautions could result in serious injury or death Replace product immediately if switch cable becomes damaged or severed Keep these instructions with warranty after installati...

Page 8: ...ge as shown in Figure A Pumping range can be adjusted by moving the float stop up or down the rod 2 Insert hose clamp through slots in mounting bracket as shown in Figure B 3 Position hose clamp aroun...

Page 9: ...OTE THE HOLE MUST ALSO BE BELOW THE BASIN COVER AND CLEANED PERIODICALLY High Head unit see 3 under Caution on front page Water stream will be visible from this hole during pump run periods mechanism...

Page 10: ...ights reserved Union Pipe DN50pipe DN50 550 mm 21 21 32 STEP 3 Check valve Ball valve 1 1 2 BSPT x 1 1 2 slip 1 1 2 Pipe 1 1 2 Pipe Union Pipe DN40 1 1 2 Pipe 13 8 2 11 9 EA0054 Vent adaptor TYPICAL D...

Page 11: ...seal Discharge pipe seal With thread Cord seal 2 orDN50 Union Check valve Grinder only Grinder only Grinder only 2 turn DN50 Length 90 mm 3 1 2 Length 762 mm 30 DN100 Inlet hub 2 BSPT x 2 slip or 2 N...

Page 12: ...drill the 5 mm hole Location to fix the float 4 Basin 460x760 mm 1 2 3 4 5 Electrical wiring and protection must be in accordance with governing electrical code and any other applicable local electri...

Page 13: ...EA0055 Basin 460x760 mm 1 2 3 4 5 Electrical wiring and protection must be in accordance with governing electrical code and any other applicable local electrical requirements Install proper Zoeller un...

Page 14: ...valve Ball valve Coupling 2 Pipe Union 13 8 2 11 9 Pump diagram for reference only EA0055 TYPICAL DEWATERING INSTALLATION Turn Top logo upward DN100Pipe RECOMMENDED INSTALLATION FOR ALL APPLICATIONS...

Page 15: ...into track if caught on outer edge B To insert your 4 ABS or PVC pipe Step 1 Cut pipe square Step 2 Chamfer end Failure to do so can cut built in O rings off The O rings in the Snap in hub make the s...

Page 16: ...0 mm DIMENSIONAL DATA A D SK2903 C B SK2694 A D C B 673 mm A B C Size Dimensions 24 x 24 26 1 2 651 mm 25 5 8 203 mm 8 711 mm 28 520 mm 20 1 2 560 mm 22 1 16 241 mm 9 1 2 406 mm 16 552 mm 21 3 4 762 m...

Page 17: ...E BELOW THE BASIN COVER AND CLEANED PERIODICALLY High Head unit see 4 under Caution on front page Water stream will be visible from this hole when pump is operating 5 mechanism s 6 Use full size disch...

Page 18: ...in accordance with all applicable local codes and ordinances All three phase pumps require motor starting devices with motor overload protection Three phase pumps must be installed in accordance with...

Page 19: ...RATION OF CONFORMITY We Zoeller declare under our sole responsibility that the models 49 53 55 57 59 72 76 86 88 98 137 139 140 4140 145 4145 152 153 161 162 163 165 185 189 222 264 266 267 268 270 42...

Page 20: ...3 161 162 163 165 185 189 371 372 373 222 264 266 267 268 270 4270 271 4271 282 292 293 294 4290 4291 422 807 2702 2722 1 2 3 20 2019 Zoeller 1 8 5 7 130 54 104 2 3 4 6 5 2 11 8 7 10 5 mm 6 9 1 2 3 4...

Page 21: ...1 4 2 3 5 6 8 9 7 10 11 4 12 13 3 14 21 1 5 5 1 2 3 4 A D Zoeller F G E B C 2019 Zoeller...

Page 22: ...610x610mm 2 1 1 4 2 1 1 4 1 1 4 2 2 or DN50 2 x16 2 or DN50 BSPT NPT BSPT 2 DN50 90 mm 170 mm 200 mm 375 mm x2 22 2019 Zoeller 1 1 3 1 90 mm 90 mm 2 1 EA0053...

Page 23: ...5 6 14 4 7 9 260 mm 3 13 12 23 2019 Zoeller 5 mm 45 180 2 375 mm 1 2 3 4 6 7 8 9 10 11 12 13 14 5 1 2 EA0053 EA0053 5mm 4 610x610mm...

Page 24: ...24 2019 Zoeller 3 EA0053 610x610 mm 2 2 2 1 1 4 1 1 4 2 1 1 4 BSPT NPT BSPT NPT BSPT NPT 2 600 mm 90 mm 200 mm or DN50 DN50 DN100...

Page 25: ...m 1 1 2 2 orDN50 2 NPT or BSPT x4 2 orDN50 2 90 mm 762 mm x3 DN100 EA0054 1 1 2 BSPT x4 1 1 2 1 1 2 1 1 2 90mm 762 mm x3 DN100 2 DN50 2 DN50 2 DN50 2 2 1 1 4 NPT x4 2 2 90 mm 762 mm x3 DN100 2 DN50 1...

Page 26: ...26 EA0095 U S Patent No 5 155 311 Canadian Patent No 2 060 748 20 170 mm 52 C 125 F 2019 Zoeller...

Page 27: ...27 A C B 1 2 3 4 1 5 A 1 2 3 1 5 230 230 90 mm 260 mm 320 mm 2019 Zoeller A 1 2 3 4 5 B A...

Page 28: ...460x560 mm 5 6 14 4 7 9 90 mm 260 mm 320 mm 13 3 12 12 12 28 2019 Zoeller 1 2 EA0054 EA0054 5 mm 4 5 mm 45 1 2 3 4 5 180 6 7 8 9 10 11 12 13 14...

Page 29: ...13 460x560 mm 29 2019 Zoeller 3 EA0054 DN100 DN50 2 2 DN50 DN50 DN50 1 1 2 1 1 2 1 1 2 550 mm Top 2 8 2 11 9 or 2 1 1 4 1 1 4 2 1 1 4...

Page 30: ...30 2019 Zoeller 460x760 mm 2 2 or DN50 2 x8 x6 2 or DN50 x3 NPT NPTorBSPT 90 mm 762 mm DN100 EA0055 1 1 4 2 1 1 4 170 mm 2 1 1 4 NPT 2 DN50...

Page 31: ...31 2019 Zoeller 460x760 mm 2 5 6 4 7 9 1 2 EA0055 EA0055 5 mm 4 5 mm 45 1 2 3 4 5 180 6 7 8 9 10 11 12 13 14...

Page 32: ...32 2019 Zoeller 3 13 3 12 12 12 EA0055 460x760 mm 5 mm 45 1 2 3 4 5 180 6 7 8 9 10 11 12 13 14...

Page 33: ...460x760 mm 33 2019 Zoeller 4 2 2 13 8 2 11 9 550 mm EA0055 Top DN100 DN50 2 2 1 1 4 1 1 4 2 1 1 4 DN50 DN50...

Page 34: ...4 DWV ABS Sch40 4 PVC Sch40 4 1 2 20 120 TOP A B 4 ABS PVC O Ring O Ring 4 1 2019 Zoeller 34...

Page 35: ...35 2019 Zoeller SK2694 A D C B 673 203 711 520 560 241 651 A B C D 460 x 560 552 762 267 406 419 460 x 760 610 x 610 460x560 mm 460x760 mm A D SK2903 C B 610x610 mm mm...

Page 36: ...2019 Zoeller 10 30 0164 50 mm 1 1 2 30 0152 63 mm 2 30 0160 90 mm 3 5 mm 4 180 10 2421 FM1597 FM0531 FM0732 FM1420 457mmX610 mm 100 mm 100 mm AC U F 3 3 3 3 1 2 3 13 8 7 11 5 4 12 12 9 10 6 1 2 3 7 9...

Page 37: ...SK1217 SK1218 37 2019 Zoeller FM0526 PVC 10 1457 3 3 L1 L2 1 2 L3 013071 006848 20 P N 10 0748...

Page 38: ...V WU 220 V 1 Ph 50 Hz 5 10 15 20 22 9 13 5 18 22 24 1 2 L1 L2 3 011835 20 WU SK305 38 2019 Zoeller V WU 1 25 5 22 WU a b c 1 2 3 4 EA0047 2 2 2 1 1 1 P N 10 1494 50 mm...

Reviews: