
- 5 -
© Copyright 2019 Zoeller Co. All rights reserved.
RECOMMENDED INSTALLATION FOR ALL APPLICATIONS
STEP 3
(Basin 610x610 mm)
EA0053
Apply glue on every piping connection.
Check
valve
Ball
valve
Inlet hub
2” Pipe
2” Pipe
Union
600 mm
(23-19/32")
(Length 90 mm
(3-1/2"))
Coupling
(Length 200 mm
(7-7/8"))
For reference only
2" BSPT slip
2" NPT slip
or
2” Pipe
2" BSPT slip
2" NPT slip
or
1-1/4” Pipe
2” Pipe
1-1/4” NPT Slipe
1-1/4” to 2” Reducer
Grinder pump only
or
(Option)
(Option)
(Option)
Pipe
DN50
Pipe
DN50
2" BSPT slip
2" NPT slip
or
DN100 Pipe
Summary of Contents for 910
Page 21: ...1 4 2 3 5 6 8 9 7 10 11 4 12 13 3 14 21 1 5 5 1 2 3 4 A D Zoeller F G E B C 2019 Zoeller...
Page 27: ...27 A C B 1 2 3 4 1 5 A 1 2 3 1 5 230 230 90 mm 260 mm 320 mm 2019 Zoeller A 1 2 3 4 5 B A...
Page 32: ...32 2019 Zoeller 3 13 3 12 12 12 EA0055 460x760 mm 5 mm 45 1 2 3 4 5 180 6 7 8 9 10 11 12 13 14...
Page 34: ...4 DWV ABS Sch40 4 PVC Sch40 4 1 2 20 120 TOP A B 4 ABS PVC O Ring O Ring 4 1 2019 Zoeller 34...
Page 37: ...SK1217 SK1218 37 2019 Zoeller FM0526 PVC 10 1457 3 3 L1 L2 1 2 L3 013071 006848 20 P N 10 0748...