background image

 

3 / 9 

 E 
 N 
 G 

  

  

 S 
 H 

 

ASSEMBLY 

(WAVE 11) 

 

Choose a smooth and clean surface 

 

 

IF THE BUOYANCY TUBE WAS STORED AT A TEMPERATURE BELOW 

0°C / 32°F, LEAVE IT AT 20°C / 68°F FOR 12 HOURS BEFORE 

UNFOLDING.

 
 

  Sprinkle some starch in the angle (joint of the buoyancy tubes to the bottom) to facilitate fitting.

                              

CAUTION, NEVER USE TALCUM POWDER

 

 

Make sure you identify the parts and direction in which they fit: 

 

- The floorboard consists of 3 main sections and 2 sections in the bow [fig 1 and 4]. 

 

- The bow sections have an upside and a downside. 

 
1.  Insert the bow section (1) into the bow angle. 
2.  Insert the rear section (5) against the transom (6) as show on fig 1. 
3.  Fit all sections together [fig.1]. 
4.  Position sections 3 and 4 as an apex (in a tent-like position) [fig 1 and 2]. 
5.  Check that all sections are correctly aligned [fig 4]. 
6.  Check that the floorboard is correctly fitted in the angles. 
7.  Flatten the apex by standing on it (in the boat) and pulling the lifelines to prevent the fabric being 
pinched [fig. 2]. 
8.  Assemble the stringers (see instructions bellow). 
 
 
 
 

ASSEMBLY OF THE STRINGERS 

 
The stringers are essential to good working of the boat: they lock the floorboard together and rigidify 
its structure. 
 

1.

  To facilitate the fitting of the first stringer, slide the other stringer under the boat, about 20 cm     

(8’’) from the side [fig. 3-a].

 

 

 

 

 

DO NOT PUT THE STRINGER IN POSITION UNDER THE BOAT UNTIL 

THE FLOOR IS FLATTENED. 

 

2.

  Position the stringer on the edge of the floorboard. 

The thicker part should be towards the top

 

[fig. 3]. 

3.

  Fit the stringers between the two buffers (9) of sections 3 and 5 [fig. 4]. 

4.

  Rotate the stringer in the angle so as to press them against the bottom [fig. 3-b and 4]. 

5. 

Because of the self-locking system of the floorboard, the stingers will fit into place once the 
buoyancy tube is inflated. 

 

Summary of Contents for Wave

Page 1: ...l del Propietario LIRE ATTENTIVEMENT CE MANUEL AVANT LA MISE EN SERVICE DE VOTRE ZODIAC CAREFULLY READ THIS MANUAL BEFORE OPERATING YOUR ZODIAC LEGGERE ATTENTAMENTE PRIMA DE INIZIARE IL MONTAGGIO DEL...

Page 2: ...IONS AND SAFETY RECOMMENDATIONS THAT MUST BE OBSERVED VOLUME 2 DEALS WITH TECHNICAL SPECIFICATIONS AND ASSEMBLY PROCEDURE OF THE BOAT AND ITS EQUIPMENT VOLUME 2 TECHNICAL SPECIFICATIONS ASSEMBLY PROCE...

Page 3: ...5 6 7 INFLATION PRESSURE 8 Install the oars 8 ASSEMBLY OF EQUIPMENT CHECK ON UNPACKING CAUTION DO NOT USE A SHARP TOOL The pack must contain 1 buoyancy tube WAVE 11 Solid Floorboard 1 5 Inflatable fl...

Page 4: ...gned fig 4 6 Check that the floorboard is correctly fitted in the angles 7 Flatten the apex by standing on it in the boat and pulling the lifelines to prevent the fabric being pinched fig 2 8 Assemble...

Page 5: ...9 4 ASSEMBLY WAVE 11 fig 1 A 1 2 3 4 5 6 fig 1 B b floorboard c tube a angle d bottom a b c d fig 2 1 2 3 4 5 6 fig 3 fig 4 7 8 1 2 3 4 5 7 9...

Page 6: ...Unscrew the valve cap Screw the valve support onto its base screw it tight but without exaggeration not to deteriorate the screw thread and check that the valve cap stays accessible TO DEFLATE Unscre...

Page 7: ...EEL 240 MBARS 3 48 PSI Inflate the main buoyancy tube and the keel until it becomes difficult to operate correct pressure 240 mb 3 48 PSI reefer to PRESSURE section making sure that each compartment i...

Page 8: ...ll both drop up to 120 mb 1 7 PSI and YOU WILL HAVE TO INFLATE AGAIN until you regain the lost pressure due to the difference in temperatures Therefore a loss of pressure at the end of the day when am...

Page 9: ...9 8 ASSEMBLY OF STANDARD EQUIPMENT TO ASSEMBLE AND INSTALL THE OARS THE REMOVABLE SEAT Install the seat before the boat is totally inflated Clic...

Page 10: ...p the boat around the transom C Start again if you feel there is still some air left in the tubes A B buoyancy tube floor tube deflated C Stow the boat in its bag as follows D Stow the boat folded on...

Page 11: ......

Page 12: ...4 m 0 40 ft 1 4 Capacit Capacity Capacit Kapazit t Capacidad ISO 5 Maximum Kg 500 lb 1100 Kg 40 lb 88 3 1 Motorisation Outboard data Motorizzazione Au enbordmotor Motorizaci n L s S Maximum CV 15 Maxi...

Page 13: ...1 du manuel chapitre Conseils de navigation La portata massima autorizzata calcolata in conformit alla normativa ISO In condizioni di massimo carico si raccomanda di navigare con particolare prudenza...

Page 14: ...sajeros 13 quille gonflable inflatable keel chiglia gonfiabile Luftkeil quilla hinchable 15 valve de gonflement plancher Aerotec Aerotec air floor inflation valve valvola di gonfiaggio Pagliolato Aero...

Page 15: ...IV IV DESCRIPTION DESCRIPTION BESCHREIBUNG DESCRIZIONE DESCRIPCI N 8 7 6 10 12 11 5 4 13 3 2 19 24 23 24 26 20 1 21 20 19 9 22...

Page 16: ...ai de Grenelle 75015 PARIS FRANCE Tel 33 1 41 23 23 23 Fax 33 1 46 48 83 85 Wave by Zodiac ZT03981 Edition 1 Copyright ZODIAC INTERNATIONAL 2011 ZODIAC INTERNATIONAL S A S U au capital de 18 000 000 E...

Reviews: