H03620
‐
00.D2.EN
–
2013/03
4
2.3
Installing
the
device
fit
the
5
stabilizing
blocks
(supplied,
see
§1.2),
if
they
are
not
already
fitted
under
the
device,
place
on
a
stable,
solid
(concrete
slab
type),
level
and
plane
surface,
ensure
that
it
will
not
be
flooded
by
condensation
water
produced
by
the
device
during
operation
(see
§2.4)
The
heat
pump
can
be
fixed
to
the
ground
using
the
brackets
at
the
base
of
the
unit
(attachments
not
included).
A
diagram
for
drilling
is
featured
on
the
back
of
the
packing
box.
2.4
Hydraulic
connections
Check
the
direction
of
the
pipework
connection
(see
§
“Dimensions”
in
the
appendix).
The
connection
include
a
Ø
50
PVC
rigid
pipe,
from
a
by
‐
pass,
on
the
swimming
pool
filtration
circuit,
after
the
filter
and
before
any
water
treatment
unit
.
check
the
tightening
of
the
hydraulic
connections,
and
check
for
leaks,
PFP
Hydraulic
circuit
pressure
Connections
=
inlet
=
outlet
Mean
water
flowrate
Head
loss
test
test
service
bar
bar
m³/h
mCE
6
3
1.5
Ø50
3
1.3
8
4
1.4
11
5
1.5
13
6
1.5
15
6.5
1.1
V1
‐
V2
‐
V3:
by
‐
pass
valves
V5
‐
V4:
setting
valves
(optional)
*
minimum
distance
by
‐
pass
filter
water
treatment
unit
electrical
protection
boxes
Fixing
holes