Installation Requirements
Filter
Filter
Pump
JXi Heater
Plumbing
PLUMBING
Heater must be plumbed down steam of filter.
Heater must be installed so that when the filter pump is off so to is the heater.
All electrical equipment must be grounded and bonded.
The J
X
i heater is Versa Plumb ready
.
The Versa Plumb System reduces hydraulic resistance by up to 50% versus other equipment sets in
its class.
The Versa Plumb System's increased hydraulic efficiency allows for up to a 1/2 HP smaller pump to
achieve the same level of flow, resulting in greater energy savings.
Faster installation with our pre-assembled plumbing kits, which enable quick and consistent equipment
plumbing design to reduce installation costs.
Innovatively designed system requires less plumbing pipe and fittings, while increasing hydraulic efficiency.
6
Summary of Contents for JXI200N
Page 1: ...1 Workbook JXi Pool Spa Heater...
Page 2: ...2...
Page 23: ...Exhaust Temperature Switch R0524300 Burner R0591700 23...
Page 26: ......