Page 7
ENGLISH
Zodiac
®
JXi
™
Gas-Fired Pool & Spa Heater
|
Installation & Operation Manual
2.2
Required Equipment
Please ensure that the following equipment is available to the installer at the time of installation.
2.2.1
Tools
Safety Eye Wear
Gloves
Phillips
Screwdriver
Flathead
Screwdriver
Pipe Wrench
Adjustable
Wrench
5 mm (3/16”)
Hex Key
Multi Grips
Digital
Differential
Manometer
Voltage Meter
PVC Pipe Cutter
Power Drill
Tape Measure
2.2.2
Materials Supplied by Installer
Please ensure that all materials used during the
installation are in accordance with local codes or the
authority having jurisdiction (AHJ) requirements. If
you have any questions regarding the materials that
need to be used during this installation please call the
Zodiac customer service center at 1300 763 021.
Indoor installations will require additional
venting and exhaust conversion materials
which are outlined in detail in
Section
3.3
NOTE:
Required materials may differ from the materials listed. Be
sure to confi rm with all local and national codes before beginning the
installation.
GAS SUPPLIES
ELECTRICAL
SUPPLIES
PLUMBING
SUPPLIES
Appropriately sized
Gas Piping
230 VAC, 50 Hz
PVC Piping
120 VAC, 50/60 Hz
Manual Gas Shut
Off Valve
*Conduit Elbow/
Conduit Connector.
PVC Cement
Gas Union
*Flexible Conduit
Tefl on Tape
Cap
*Wire Nuts
Leak Solution
1.6 mm (1/16”)
Hose “T”
3.18 mm (1/8”) -
1.6 mm (1/16”)
Barbed Adapter
1.6 mm (1/16”)
Flexible Hose
*Electrical components only required when converting heater to 120 V input.