AERAZUR
COMPONENT MAINTENANCE MANUAL
C10 LIFE JACKET
25-65-09
REV
12
PAGE
708
5.
Packing Appl.D – PROCEDURE P3 (Figures 707 to 710)
A.
Prior to folding (Figure 707)
Completely deflate the life jacket using a vacuum pump or a vacuum cleaner.
Put the life jacket completely flat on a table.
Stow the belt into lengths of 10cm and hold the stowing loops in place with an elastic
band.
Figure 707
The document reference is online, please check the correspondence between the online documentation and the printed version.