BGM1000 Series Barrier Gate (APP Version) User Manual
P a g e
| 26
Copyright©2023 ZKTECO CO., LTD. All rights reserved.
2.
Adjust the vertical position of the boom arm (adjusted by mechanical structure)
The connecting boom arm crank is in an unfolded shape, and the connecting boom
arm's two rotation points and the reducer's output shaft are in an unfolded 3-point
line. This is the boom arm's vertical position. If the boom arm is not in the vertical
position and is inclined, unscrew the two screws on the rocker (rocker-arm), rotate the
boom arm to the vertical, and tighten the screws..
Boom Arm
Boom Arm