14
14
KAPITEL 1
SAFETY / RESIDUAL RISKS
EQUIPMENT’S TRANSPORT, UNPACKING AND SETTING UP
- The transport must be carried out only with sufficient personnel, according to the national
industrial safety regulations.
- A forklift or a lift tray truck are recommended for the transport of the pallet (weight approx. 200
kg). Caution when lifting!
- The Titanium Spectral-Colouring Anodizer may only be moved and put down on surfaces with
suitable stability, in a dry place and in a non-corrosive environment.
- Stable, non-slip installation surface, which can bear a minimum weight of 200 kg.
- Caution when removing the cardboard casing (glass cladding).
- Pay attention to danger of injury when unpacking and setting up the device.
- The power supply must be installed and attached by an expert.
- The device must not be connected to the electric circuit during the installation phase: Danger of
electric shock.
- The original packaging has to be kept for at least 1 year.
SAFETY PROCEDURES AT THE SITE OF THE INSTALLATION
- Stable, non-slip installation surface, which can bear a minimum weight of 200 kg.
- Safety distance of min. 2 m to combustible material.
- Safety distance of min. 2 m to water.
- Safety distance of min. 1 m to all sides (for cooling air, access).
DISPATCH AND FREIGHT COSTS
Unless otherwise agreed in writing, the buyer is responsible for dispatch, freight and possible
import fees.
Check immediately after receipt of the delivery for completeness and integrity of the system.
Evident defects must be noted on the delivery documents, in order to claim for compensation
against the transport company.
In case of complaints, have the transport documents countersigned by the carrier and send a copy
to Zirkonzahn.
Indication on transport packaging (fragile, this side up).
Summary of Contents for titanium spectral-colouring anodizer
Page 1: ...titanium spectral colouring anodizer Operator s and maintenance manual...
Page 3: ...03 03...
Page 8: ...08 08 KAPITEL...
Page 15: ...15 15 CHAPTER 2 COMPONENTS COMPONENTS...
Page 18: ...18 18 KAPITEL 3 TECHNICAL DATA...
Page 22: ...22 22 KAPITEL 5 OPERATION...
Page 24: ...24 24 KAPITEL 6 VOLT DIAGRAMS...
Page 29: ...29 29 CHAPTER 9 INSTRUCTIONS INSTRUCTIONS...
Page 43: ...43 43 General notes...