background image

6

www.zippity-outdoor.com

STEP 4: COMPLETE THE PANELS

STEP 4.1

1.

Slide the horizontal top rail - front (F) over the posts ensuring the picket holes in the top rail are facing down.

2.

Guide the pickets into the top rail and slide it down until the pre-drilled holes in the rail align with the holes in the

post.

3.

Drive (4) ¾” screws into the aligned pre-drilled holes.

STEP 4.2

Repeat Steps 2-4 to create the other two screen panels. The other two panels will use side horizontal rails that

have extra holes at the ends.

Front panel has no 

extra pre-drilled holes

1

2

3

Align

F

Summary of Contents for ZP19052

Page 1: ...or com ASSEMBLY INSTRUCTIONS LIBERTY LATTICE AC SCREEN KIT 45 MIN approximate assembly time for 3 panels 6935 Reames Rd Ste K Charlotte NC 28216 support zippity outdoor com 704 892 5222 877 234 6196 z...

Page 2: ...s please contact our customer service department EMAIL support zippity outdoor com PHONE 704 892 5222 877 234 6196 Customer service agents are available to take calls weekdays from 8am 5pm EST To help...

Page 3: ...orizontal Top Rail Front 1 1 x 1 x 36 Horizontal Top Rail Side 2 1 x 1 x 36 Horizontal Bottom Rail Side 2 1 x 1 x 36 Horizontal Picket 27 1 x x 33 marked with sticker labeled 1 Vertical Picket 24 1 x...

Page 4: ...ils have no pre drilled holes at these locations Side rails will have two pre drilled holes on each end B F D STEP 2 2 STEP 2 3 Take two posts G and position them so the routed holes face in towards e...

Page 5: ...ne of the horizontal bottom rails front D and slide it up over the posts as illustrated Ensure the routed picket holes in the rail are facing up 2 Align the pre drilled holes in the posts and the rail...

Page 6: ...e the pickets into the top rail and slide it down until the pre drilled holes in the rail align with the holes in the post 3 Drive 4 screws into the aligned pre drilled holes STEP 4 2 Repeat Steps 2 4...

Page 7: ...place it at a right angle to the front panel as shown 2 Drive 4 4 screws K into the pre drilled holes in the top and bottom rail 3 Repeat this process on the other side with the third screen as shown...

Page 8: ...sage Useful for holding small trays plants etc Only to be used in winter months when condenser is not running Protects your condenser from winter elements 6935 Reames Rd Ste K Charlotte NC 28216 suppo...

Reviews: