5
www.zippity-outdoor.com
STEP 3: ATTACH THE VERTICAL PICKETS
STEP 3.2
STEP 3.1
Insert the eight vertical pickets (I) into the routed picket holes in the rail.
1.
Take one of the horizontal bottom rails - front (D) and slide it up over the posts as illustrated. Ensure the routed
picket holes in the rail are facing up.
2.
Align the pre-drilled holes in the posts and the rail.
3.
Drive a ¾” screw (J) in each of the pre-drilled holes on the front and back of the rail (4 total).
NOTE: Vertical pickets will
have a sticker labeled "2".
I
1
2
3
Align
D
J