R I V E T T / R O C K E T T
19
Forward bottom sheet in place over bevel.
Better view of bottom sheets.
State of the art bottom…
Finish sanding the aft sponson bottom
bevel so that it matches the forward
portion.
Test fit the forward bottom in place.
This should go back only far enough to
cover the bevel, and leave a square
edge.
Mark the forward bottom so that you can
locate it the same distance from the
bevel when you glue.
Check to be sure that the front of the
forward bottom is sitting nicely on the
inner chine. If not, scrape some more
with your razor until it does.
Epoxy the forward bottom in place the
same was you did the aft bottom.
Match the inside overhang with the aft
bottom sheet.
Tape in place and let cure.
When you are done, you should have a
nice bottom!
This is a water shearing, anti capillary
bottom. Designed to repel water and
keep it from climbing.
Makes for a much more efficient (faster)
hull.
Summary of Contents for Bullitt Thunderboat
Page 55: ...R I V E T T R O C K E T T 53 ...