11
807042 v1.00 03.21 HydroTap G5 UltraCare Install Instruct
No Mixer
Installation instructions
Step 4 – Command Centre installation
4.1
4.2
Mains water connection
Flush water supply lines before any plumbing connections are
made, to prevent sediment from affecting operation.
!
Connect electrical cable to the
side of the Command Centre.
Power must remain OFF until
commissioning.
4.3
Mains water
(isolation valve
not supplied)
Command
Centre
MAINS IN
Connect the USB
cable from the tap
to the USB cable
plug from the
Command Centre.