14
Installation instructions
802742UK V4.00 Sept 2018 - Zip HydroTap Industrial
Technical support
Tel: 0345 6 005 005 Email: [email protected] www.zipwater.co.uk
2.4 Preferred ventilation arrangement shown below.
The ducted vent kit supplied with the Command Centre exhausting through the kick-space should be used, to
provide adequate ventilation in all conditions. (Ancillary components are not shown in these diagrams).
A
B
C
100mm
min.
Inlet grille
Position vent grille on
either the kick board or the
cupboard ends
Inlet grille should be
fitted in baseboard
A
Cupboard back must be
fully closed to prevent
recirculation into
cupboard from
kick space.
2.2 BC Commercial Command Centres
Ventilation
2.3 Ventilation for all models
• The clearance envelope dimensions stated in the Specification sheets and Installation instructions must
be observed.
• Adequate ventilation must be provided to ensure that the cupboard temperature doesn't exceed 35
0
C.
Vent cut-out details
A
Air outlet vent
(flat vent)
B Air inlet vent
314
Ø
12 x 2
326
5
43max
285
60
Ø
12 X 4
=
=
45
284
Ø
12 x 4
C
Ducted vent
Important
See section 5 Command-Centre
installation, page 26
!