4
Installation instructions
802742UK V4.00 Sept 2018 - Zip HydroTap Industrial
Technical support
Tel: 0345 6 005 005 Email: [email protected] www.zipwater.co.uk
Before installation
• Read the instructions and check if there is adequate space to install all of the components.
• Note
Not all fittings are supplied with the appliance kit. Isolation valves are not supplied.
• Check the mains water pressure is within min / max requirements (see page 9).
• Check the water quality to determine if extra filtration will be required.
• Note
This product must be fitted to a wholesome water supply.
• Check the Command Centre rating plate and ensure correct power is available.
• Check the under counter cupboard floor supporting the Command Centre is adequate for its total
weight, when full of water.
Before commissioning
• Check the system has been installed correctly.
• Check all plumbing fittings for water tightness.
• Ensure the outlet and vent pipes are positioned to drain correctly.
• Ensure there is adequate ventilation.
• Check all tubes and pipes from the Command Centre to the tap have a constant rise and there are
no sags or kinks in the hoses.
• Check all electrical connections are correct and there are no loose wires.
Commission
(see section 6)
• Flush the supply line before connecting.
• Turn on the water and check for leaks.
• Flush the filter(s).
• Activate / enable the booster (if fitted).
• Where applicable, programme the Command Centre to suit the customer’s requirements.
Installation checklist