Page 4 of 36
802265US v1.27 06.21 BCS, BCS100-75 Install Instructions
Before Installation:
A.
Read the instructions and check if there is adequate space to mount all of the components.
B.
Note: Not all fittings are supplied with the appliance kit. Isolation valves are not supplied.
C.
Check the mains water pressure is between 250 - 700 kPa (37 - 100 psi).
D.
Products are rated for either 110-120V, 60Hz OR 230V, 50Hz AC installations. Check that the
electrical power supply is suitable for your HydroTap.
E.
Check the water quality to determine if extra filtration will be required.
NOTE:
This product
must be fitted to a potable water supply.
F.
Check the appliance rating plate and ensure correct power is available for the appliance.
G.
Check the under counter cabinet supporting the appliance is adequate for the total weight of
the appliance, when full of water.
Before Commissioning:
1.
Check the Command Center has been installed correctly.
2.
Check all plumbing fittings have been tightened.
3.
Ensure the outlet and vent pipes are positioned to drain correctly.
4.
Ensure there is adequate ventilation.
5.
Check all tubes from the Command Center to the faucet have a constant rise and there are no
sags or kinks in the hoses.
6.
Check all electrical connections are correct and there are no loose wires.
Commission: (See Section 5)
7.
Flush the supply line before connecting.
8.
Turn on the water and check for leaks.
9.
Flush the filters (this commences auto calibration for boiling models)
10.
Activate / enable the Booster (if fitted)
11.
Purge the CO
2
12.
Calibrate the safety sensor (for Boiling models)
13.
Where applicable, programme the Command Center to suit the customer’s requirements.
Installation checklist