802265US v1.27 06.21 BCS, BCS100-75 Install Instructions
Page 21 of 36
5.3
-
Boiling Calibration
Commissioning
Press the calibration button and the system will
commence the Boiling calibration procedure. This will
take approximately 5-6 minutes.
5.4
-
Booster
NOTE:
This product does not have a booster option.
When asked if a booster is installed, make sure NO is
selected.
BC Sparkling
10:30 Wed 04,Jul 2018
BC Sparkling
10:30 Wed 04,Jul 2018
NOTE:
For any subsequent filter changes or any operational procedures, please refer to the HydroTap user
guide, located inside the filter housing access door.
OPEN
CLOSED
Stop cock operation
1. Turn the flush line stop cock ON (See diagram).
2. Press [Start] and allow at least 10 liters (2.6 gallons) of
water to flush through the filter.
3. The product details will be displayed in the screen.
4. Once the filter flush is finished, Turn the stop cock OFF
then press [Stop] to end filter flush mode.