15
807066 v1.00 03.21 HBP AB Install Instructions
Step 6 – Commissioning
Turn on electrical power
Turn the mains electrical power ON. Refer to the screen.
Touch the white circle left of the
[Tick] to “Continue”.
Boiling Calibration will commence. Allow several minutes for the water to boil.
Calibrating
Completed
When completed, as prompted, turn on the mains water supply.
Select
to
Continue
The home screen will be shown (see section 2.1).
The tank will fill and heat. Allow 15-30 minutes for the water to reach boiling set
temperature.
6.4