
804052UK - Residential chilled and sparkling installation instructions - Sept 2016 - v3.02
Page 3 of 20
HydroTap
®
G4 specifications
Installation check list ....................................................................................................................4
General product features .............................................................................................................5
Important safety instructions ........................................................................................................6
Warnings ......................................................................................................................................7
Major components and accessories .............................................................................................8
Technical specification .................................................................................................................9
Before installation and site requirements .....................................................................................10
Installation instructions
Step 1 -
Measure and cut all the tap holes before fitting the taps. Refer to 803341UK Tap installation
instructions supplied with the tap head.
Step
2 -
Check for adequate ventilation.
Section 1 - Ventilation.
1.1 - Ventilation on all models ...........................................................................................11
Step 3 -
Fit the CO
2
gas cylinder
Section 2 - CO
2
cylinder and regulator
2.1 - 2.4 Connect, secure and test the CO
2
cylinder .........................................................12-13
Step 4
- Install the Command-Centre
TM
.
Section 3 - Command-Centre
TM
installation
3.1- Mains water (braided) supply hose ...........................................................................13
3.2- Chilled and sparkling HydroTap
®
G4 models..............................................................14
3.3- Chilled and sparkling HydroTap
®
G4 models together with mixed hot cold water ......15
Step 5
Commission the HydroTap
®
G4
Section 4 - Commissioning
4.1- 4.2 Select language and CO
2
purge ..........................................................................16
4.3- Filter flush ..................................................................................................................17
Trouble shooting
Trouble shooting table ..................................................................................................................18
End of life disposal .......................................................................................................................18
Warranty .......................................................................................................................................19
Contact details .............................................................................................................................20
Index