Page 6 of 12
Zip Hydroboil - Installation & Operating Instructions - 81419 - January 2004
c) Electrical
For concealed electrical connection, connect a power cable from the
rear of the heater to the terminal block within the heater as shown.
Do not turn the power ON
until the heater is filled with water.
con
tinued
continued
Step 4 - Assembling
Place the heater case back onto the chassis and secure the two top and four
bottom fixing screws.
Screw the tap assembly clockwise onto the tap outlet tube using PTFE tape.
Screw the tap clockwise until the tap assembly touches the fascia without
pressure.
Continue to turn the tap a further one full turn until the tap lever is upright.
Step 5 - Commissioning
Check previous steps. Turn water supply ON, check connections for leaks.
Turn tap handle to the “lock down” side and leave open until water starts
flowing from the outlet. Return the handle to the closed position to stop water
flow and turn the handle 180º to the “cup fill” position.
See page 8 for LED Display information.
Turn power on. After a short time, boiling water will be available and will be
maintained close to boiling point thereafter. Initial heating periods are:
Inlet water temperature
15°C
10°C
15 Litre models
40 minutes
43 minutes
25 Litre models
47 minutes
50 minutes
40 Litre models
60 minutes
64 minutes
Installation Procedures
continued
Single element
PCB and connections
Multiple element
PCB and connections
Terminal
block
Terminal
block
Size
Kw
Amps
15 Ltr
2.4 kW
10 A
25 Ltr
3.6 kW
15 A
40 Ltr
6.0 kW
25 A