Read These Warnings First

Please read all installation requirements, installation procedures and precautions
before installing any Hydroboil instant boiling water heater.

Never attempt to install any Hydroboil instant boiling water heater without reading
all of the applicable instructions.

In some hard water areas where mineral scale accumulation in the boiling
chamber of the Hydroboil may become a problem, consideration should be given
to the maintenance required. A suitable form of water treatment may be
necessary.

The cold water supply to this appliance must be portable and fall within your local
water authority guidelines.

All plumbing connections must be made in accordance with local authority
requirements.

The Hydroboil instant boiling water heater is not intended for use by young
children or infirm people without supervision.

Young children should be prevented from having access to ensure that they are
not able to use or play with the heater.

If the installation site is located more than 1000 metres above sea level, the
installer should contact a authorized agent to obtain alternate  PCB settings.

If the power supply cable is damaged it must be replaced by a Authorized Service
Provider or a qualified electrician.

Do not remove the cover of the heater under any circumstances without first
isolating the heater from the power supply.

Do not use strong, corrosive or abrasive cleaners to clean the case of the heater.

Frost protection: If this heater is located where ambient air temperature could fall
below 5ºC when the heater is not in use, do not turn off the appliance electrically.
This safeguard does not offer the same protection to the connecting pipework and
fittings.

The ambient temperatures this unit should operate with is 5 ºC - 50ºC

This heater is intended only for indoor use and should never be installed outdoors
or be exposed to the elements of nature.

This unit must not be positioned in an area that may be cleaned by a water jet.
This unit must not be cleaned by a water jet.

Before installing, ensure that the following are available:

a) Sufficient space to position the heater so there is at least 150 mm 

clearance above the heater for service access, 65 mm to its left and 
20 mm to its right – the tap outlet usually should be positioned at least 
200 mm above a draining board or drip tray.

b) For units with 2.4 Kw element (15 ltr) standard 10 amp 220-240 volt power

cable positioned as shown on the paper mounting template for connection
from the rear of the heater to the terminal block within the heater, OR a
standard 10 amp 220-240 volt power outlet on the wall within 1500 mm of
the heater. For units with 3.6 Kw element (25 ltr) or multi element units (40 L)
an isolating switch in the fixed wiring and attached to a secure surface is
required.

Installation Requirements

Summary of Contents for 11061 Hydroboil

Page 1: ...boiling water 11062 Hydroboil Electronic 15 Litre White 11061 Hydroboil Electronic 15 Litre S S 12062 Hydroboil Electronic 25 Litre White 12061 Hydroboil Electronic 25 Litre S S 04062 Hydroboil Electr...

Page 2: ...Installation Procedures 4 Step 1 Positioning 4 Step 2 Fastening 4 Step 3 Connecting 5 a Plumbing 5 b Venting 5 c Electrical 6 Step 4 Assembling 6 Step 5 Commissioning 6 Problem Solving 7 Operating Pr...

Page 3: ...the heater under any circumstances without first isolating the heater from the power supply Do not use strong corrosive or abrasive cleaners to clean the case of the heater Frost protection If this h...

Page 4: ...ger vessels Minimum clearances for service are 150 mm top 65 mm left and 20 mm right Mark corner position on wall so to position mounting hole template Step 2 Fastening Position mounting hole template...

Page 5: ...Pa a pressure limiting valve must be installed in the cold water supply line We recommend a valve rated at 350 kPa for this application b Venting A vent at the base of the heater must be plumbed to a...

Page 6: ...er is upright Step 5 Commissioning Check previous steps Turn water supply ON check connections for leaks Turn tap handle to the lock down side and leave open until water starts flowing from the outlet...

Page 7: ...a vessel to be filled without holding your hand where it may be affected by steam Pot fill position Cup fill position Symptom Possible Cause Solution Fails to dispense water Water isolating valve tur...

Page 8: ...brought to boiling point and is being maintained normally within 1 C of boiling point During the initial heat up the contents of the boiling chamber may be below boiling point for a period and during...

Page 9: ...Mounting Template Wall template for 15 litre 25 litre 40 litre models 374 15L 25L 499 40L 295 15L 25L 420 40L 591 15L 25L 771 25L 831 40L 188 15L 25L 313 40L EXTERNAL PLUMBING INTERNAL PLUMBING BENCH...

Page 10: ...multi element PCB is factory pre set to give optimum performance in all normal installation situations For high altitude installations above 1000mtrs there is an alternative dip switch setting See bo...

Page 11: ...p kit 13 90536 Fascia lens and actuator kit 14 90494 Meter tube kit 2400 watt 14 90526 Meter tube kit 3000 watt x 2 14 90527 Meter tube kit 3600 watt 15 90502 Tap assembly complete 16 90594 Main PCB k...

Page 12: ...Service Provider or the cost of removal cartage and re installation of any component of the appliance if it needs to be returned for repair to Zip or its Distributor This warranty does not cover damag...

Reviews: