4 Attach both skid shoes to the auger side plates with the screws and nuts. Move the
skid shoes down as far as possible. Be sure both skid shoes are adjusted evenly.
Tighten securely.
Discharge Chute
1 Grease underside of discharge chute ring (if not already greased).
2 Install discharge chute over opening in the auger housing and secure with fasten-
ers.
3 Secure the upper crank lever bracket (attached to the crank lever) to the upper left
side of the handlebar with a locknut and two curved washers until they are finger
tight.
4 Apply grease to the spiral of the crank lever.
5 Insert the spiral end of the crank lever into the lower bracket and secure with the
flat washer and clevis pin.
Speed Shift Linkage
1 Place the shift arm on shift yoke. Line up the holes in the shift arm and shift yoke.
Insert a roll pin through the holes.
39
D
GB
Summary of Contents for Yellow GARDEN LINE 720 YGL N.G. NEW GENERATION
Page 2: ...D Schneefr se 3 GB Petrol Snow Blower 30...
Page 30: ...30 D GB...
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......