
Page 4
Standard Cable Connections
Select the desired mounting locations and drill holes per template.
Run cables between Actuator/Processor and Control Head.
At the Control Head, strip back the PVC cover on the shielded cable approximately 2"
(50mm)
.
Strip and cut off the shielding and drain wire flush with the end of the PVC cover (the
drain wire at the Control Head is not connected to ground).
Strip 3/8"
(9,5mm)
insulation off each wire.
Twist the individual strands of the wires to minimize fraying.
Crimp a locking fork terminal (included with each Control Head) to each of the conduc-
tors.
Make connections to the Control Head as shown above for MicroCommander, ClearCom-
mand, and CruiseCommand Systems.
Hand Held Control is a Station option. Contact your ZF Mathers Dealer for further information
on Hand Held requirements and options.
Summary of Contents for ClearCommand
Page 56: ......
Page 57: ...APPENDIX A 1 ...
Page 58: ......
Page 60: ...Appendix A 6 20 01 Page 2 ...
Page 63: ...Page 5 ...
Page 64: ...Page 6 ...
Page 68: ...Page 10 ...
Page 70: ...Page 12 ...
Page 72: ...Page 14 ...
Page 78: ...Page 20 ...
Page 82: ...Page 24 ...
Page 85: ...APPENDIX B 1 ...
Page 86: ......
Page 97: ...APPENDIX C 1 ...
Page 98: ......
Page 99: ...Drawing 11202F 1 ...
Page 100: ... ...
Page 101: ...Drawing 11202F 2 ...
Page 102: ... ...
Page 103: ...Drawing 11202F 3 Notes Page ...
Page 104: ... ...