
INSTALLATION
Page 16
5.3 P
ROCESSOR
C
ONNECTIONS
AND
S
ET
-
UP
5.3.1 Processor Station Connections
A) Insert cable through the appropriate watertight cable grip.
B) Strip the PVC jacket and shielding back approximately 3 inches
(75mm).
C) Stagger wire lead length to match the correct Station terminal strip.
D) Strip the wire insulation 3/8-inch
(9,5mm)
on each wire.
H) Connect the shielding drain wire (bare wire) to Terminal 8 on the sta-
tion terminal strip.
Figure 7: Plug Removal and Cable Grip Installation
CAUTION: Wire leads must not touch frame.
E) Locate the WAGO Tool that is taped to the relay on
the circuit board in each Processor. Use this tool to
depress the spring lock to release the Jumper from the
Station terminal strip.
F) Use the WAGO Tool to depress the spring lock for
the individual wire connections to the terminal strip.
(Refer to Figure 8:)
G) Connect colors to the station terminal strips as shown
on System Drawing in Appendix C.
Figure 8: Terminal Connection
CAUTION:
The shielding drain wire MUST NOT touch any other components.
Summary of Contents for ClearCommand
Page 56: ......
Page 57: ...APPENDIX A 1 ...
Page 58: ......
Page 60: ...Appendix A 6 20 01 Page 2 ...
Page 63: ...Page 5 ...
Page 64: ...Page 6 ...
Page 68: ...Page 10 ...
Page 70: ...Page 12 ...
Page 72: ...Page 14 ...
Page 78: ...Page 20 ...
Page 82: ...Page 24 ...
Page 85: ...APPENDIX B 1 ...
Page 86: ......
Page 97: ...APPENDIX C 1 ...
Page 98: ......
Page 99: ...Drawing 11202F 1 ...
Page 100: ... ...
Page 101: ...Drawing 11202F 2 ...
Page 102: ... ...
Page 103: ...Drawing 11202F 3 Notes Page ...
Page 104: ... ...